Recommended sequence of operations
General instructions
cgm
.3-huv system: Fully gas-insulated
medium-voltage switchgear
5.6.3. Circuit-breaker function in
cgm
.3-huv-lv
and
cgm
.3-huv-rbv
cubicles
Spring charging and actuating levers.
Figure 5.38.
Earthing actuating lever S2/S1 and for selector handle
Figure 5.39.
Spring charge lever
Opening operation from earthing position
Initial conditions: earthing switch S2 closed and circuit-
breaker closed
1.
Open the circuit-breaker by pressing the "O" button on
the front keypad and check the status indicating relay.
Figure 5.40.
Opening button detail