background image

3A@24VDC

Relay

N.C.

Relay Output

Console

RSVD

RXD

RS-232, 115200bps, 8, N, 1

GND

TXD

N.C.

G1

G2

G3

G4

G9

G10

G11

G12

G5

G6

G7

G8

G1~G12

1 BI_DA+
2 BI_DA-
3 BI_DB+
4 BI_DB-
5 BI_DD+
6 BI_DD-
7 BI_DC-
8 BI_DC+

6

5

7

3

2

1

8

4

Power

24-110VDC

V-

N.C.

V+

N.C.

Power
Failure
Bypass

Power
Failure
Bypass

TGRS-T120-M12X-BP2-WV

LNK/ACT Speed

Reset

G1

G2

G3

G4

G5

G6

G7

G8

G9

G10

G11

G12

LNK/ACT

Speed

PWR

Status

R.M.

Ring

Fault

Quick Installation Guide

Version 1.0

Q

uick

I

nstallation

G

uide

Introduction

PRINTED  ON  RECYCLED  PAPER

Q I G

ORing's Transporter

series managed Router switches are designed for

T M

industrial applications such as rolling stock, vehicle, and railway. The

TGRS-

T120-M12X-BP2-WV

, which is compliant with the EN50155 standard, is a

m a n a g e d

G i g a b i t

R e d u n d a n t

R i n g

E t h e r n e t

s w i t c h

w i t h

12x10/100/1000Base-T(X) ports which is specifically designed for the
toughest and fully compliant with EN50155 requirement. The switch support

IEC 61375-2-5 TTDP

IEC 61375-2-3

(Train Topology Discovery Protocol) and

TRDP

(Train Real-Time Data Protocol) for railway application, improving the

operational efficiency and minimize configuration errors. It is specifically
designed for the toughest industrial environments.

TGRS-T120-M12X-BP2-

WV

EN50155 Ethernet switch uses M12 connectors to ensure tight, robust

connections, and guarantee reliable operation against environmental
disturbances, such as vibration and shock.

TGRS-T120-M12X-BP2-WV

EN50155 provides a wide power input range from 24 to 110VDC.

TGRS-T120-

M12X-BP2-WV

includes 2 sets of bypass ports that protect the network from

failures and Network maintenance by ensuring network integrity during power
loss. And support wide operating temperature from -25 C to 70 C.

o

o

TGRS-

T120-M12X-BP2-WV

can also be managed centralized and convenient by

Open-Vision, as well as the Web-based interface, Telnet and console (CLI)
configuration. Therefore, the router switch is one of the most reliable choice
for highly-managed and railway application.

Package Contents

Installation

Wall-mount

The device can be fixed to the wall. Follow the steps below to install the device on the wall.

Step 1:

Hold  the

evice  upright  against  the  wall

d

Step 2:

Insert  four  screws  through  the  large  opening  of  the  keyhole-shaped  apertures  at  the

top  and  bottom  of  the  unit and fasten the screws to the wall with a screwdriver.

Step 3:

Slide  the

evice  downwards  and  tighten  the  four  screws  for  added  stability.

d

The device is shipped with the following items. If any of these items is
missing or damaged, please contact your customer service representative
for assistance.

Preparation

Before you begin installing the device, make sure you have all of the package
contents available and a PC with Microsoft Internet Explorer 6.0 or later, for
using web-based system management tools.

Elevated Operating Ambient:

If installed in a closed  environment, make sure

the  operating  ambient  temperature  is  compatible  with  the  maximum
ambient  temperature (Tma) specified  by  the  manufacturer.

Reduced Air Flow:

Make sure the amount of air flow required for safe operation

of the equipment is not compromised  during  installation.

Mechanical Loading:

Make sure the mounting of the equipment  is  not  in  a

hazardous condition due to uneven mechanical loading.

Circuit Overloading:

Consideration should be given to the connection of the

equipment to the supply circuit and the effect that overloading of the circuits
might have on overcurrent protection and supply wiring. Appropriate
consideration of equipment nameplate ratings should be used  when addressing
this concern.

Safety & Warnings

For pin assignments of power, console and relay output ports, please refer to the following tables.

Contents

TGRS-T120-M12X-BP2-WV

Pictures

Number

1

Panel Layouts

Front View

1. Power status LED
2. System status LED
3. R.M. status LED
4. Ring status LED
5. Fault LED
6. Reset button
7. Ethernet LAN ports
8. Ethernet WAN ports with bypass
9. Link/ACT LED for Gigabit ports
10. Speed LED for Gigabit ports
11. Console port
12. Relay output
13. Power connector

Wiring

Grounding

Grounding and wire routing help limit the effects of noise due to electromagnetic interference
(EMI). Run the ground connection from the grounding pin on the power connector to the grounding
surface prior to connecting devices.

Power port pinouts

The device supports one set of power supply and uses the M12 A-coded
5-pin  male  connector  on  the  front  panel  for  power  input.

Step 1:

Insert a  power cable to the power connector on the device.

Step 2:

Rotate the outer ring of the cable connector until a snug fit is

achieved.  Make  sure  the  connection  is tight.

Relay output port pinouts

Relay

N.C.

3A@24VDC

Network Connection

The switch has twenty 10/100/1000Base-T(X) Ethernet ports in the form of M12 connector.
Depending on the link type, the switch uses CAT 3, 4, 5,5e UTP cables to connect to network
devices (PCs, servers, switches, routers, or hubs). Please refer to the following table for cable
specifications.

TGRS-T120-M12X-BP2-WV

1907-200-XX

S w i tc h

E N 5 0 1 5 5

I N D U S T R I A L

1

Instead of screwing the screws in all the way, it is advised to
leave a space of about 2mm to allow room for sliding the
switch between the wall and the screws.

Cable

Type

Max. Length

Connector

10BASE-T

Cat. 3, 4, 5 100-ohm

UTP 100 m (328 ft)

8-pin female M12

X-coding connector

100BASE-TX

Cat. 5 100-ohm UTP

UTP 100 m (328 ft)

8-pin female M12

X-coding connector

1000BASE-T

Cat. 5/Cat. 5e 100-ohm UTP

UTP 100 m (328 ft)

8-pin female M12

X-coding connector

For pin assignments of the Ethernet ports, please refer to the following tables.

QIG

1

11

12

13

4 5

6

2 3

The switch uses the M12 A-coded 5-pin female connector
on the front panel for relay output. Use a cable with an M12
A-coded 5-pin male connector to connect the relay. The
relay contacts will detect user-configured events and form
an close circuit when  an event is triggered.

Console port pinouts

N.C.

RXD

RS-232, 115200bps, 8, N, 1

GND

TXD

N.C.

Dimension

Unit =mm (Tolerance ±0.5mm)

TGRS-T120-M12X-BP2-WV

EN50155 managed router switch

3A@24VDC

Relay

N.C.

Relay Output

Console

RSVD

RXD

RS-232, 115200bps, 8, N, 1

GND

TXD

N.C.

G1

G2

G3

G4

G9

G10

G11

G12

G5

G6

G7

G8

G1~G12

1 BI_DA+
2 BI_DA-
3 BI_DB+
4 BI_DB-
5 BI_DD+
6 BI_DD-
7 BI_DC-
8 BI_DC+

6

5

7

3

2

1

8

4

Power

24-110VDC

V-

N.C.

V+

N.C.

Power
Failure
Bypass

Power
Failure
Bypass

TGRS-T120-M12X-BP2-WV

LNK/ACT Speed

Reset

G1

G2

G3

G4

G5

G6

G7

G8

G9

G10

G11

G12

LNK/ACT

Speed

PWR

Status

R.M.

Ring

Fault

9

10

7

8

V-

N.C.

V+

N.C.

6

5

7

3

2

1

8

4

10/100/1000Base-T(X)

M12 X-coding

Pin No.

Pin Definition

#1

BI_DA+

#2

BI_DA-

#3

BI_DB+

#4

BI_DB-

#5

BI_DD+

#6

BI_DD-

#7

BI_DC-

#8

BI_DC+

Отзывы: