Installation
10
Notes about installation and wiring
•
Connect the
NETC01-M2
and other peripheral control equipment directly to the grounding point so as to
prevent a potential difference from developing between grounds.
•
When relays or electromagnetic switches are used together with the system, use noise filters and CR circuits to
suppress surges generated by them.
•
Keep cables as short as possible without coiling and bundling extra lengths.
•
Place the power cables such as the motor and power supply cables as far as 100 mm (3.94 in.) from the signal
cables. If the power cables and signal cables have to cross, cross them at a right angle. Place the AC input cable and
output cable of a noise filter separately from each other.
Example of
NETC01-M2
installation and wiring
Master station
NETC01-M2
RS-485 communication cable
Power supply cable
(Shielded cable)
Grounded panel
OPX-2A
Noise
filter
DC power
supply
AC
Grounding Grounding
Grounding
Grounding
Grounding
Shielded cable
Termination
resistor
MECHATROLINK-II
communication cable
RS-485 communication
compatible product
Precautions about static electricity
Static electricity may cause the
NETC01-M2
to malfunction or suffer damage. While the
NETC01-M2
is receiving
power, handle the
NETC01-M2
with care and do not come near or touch the
NETC01-M2
.
Always use an insulated screwdriver to change the switches of the
NETC01-M2
.
The
NETC01-M2
uses parts that are sensitive to electrostatic charge. Before touching the
NETC01-M2
, turn off the power to prevent electrostatic charge from generating. If an electrostatic
charge is impressed on the
NETC01-M2
, the
NETC01-M2
may be damaged.
Содержание NETC01-M2
Страница 55: ...55 ...