9
OPERATION
Unpacking and Initial Operations
Open the shipping box on both sides, remove the
packaging material and roll the machine out of the box.
Pre-Run Inspection
Before each use, inspect the accessory such as the pad
driver for cracks, tears, or excess wear. If the machine or
accessory is dropped, inspect for damage to install an
undamaged accessory.
Repair the damaged machine before the next application.
Tilt the head back and place the foot of the bumper on the
ground.
Choose a pad for the appropriate application. Center the
pad on the driver plate.
Position the handle in a lower position.and push slowly
forward until the machine base tilts towards the ground.
CAUTION
Make sure to put the wheels back on the ground in time to
avoid the base from falling on the ground. This might cause
damage!
Check to make sure the power switch is in the “off” position.
Power Cable / Quick Disconnect
Take provided power cable and connect to machine quick
disconnect located on machine. Push and twist to lock
cables together. You can now plug power cord into outlet.
WARNING
Spray System Preparation
Fill the bottle cartridge with recommended cleaning solution.
For priming the pump system for the first system, move the
valve lever to the vertical position and depress spray switch
for 30 seconds. For standard priming, 10 seconds is usually
sufficient.
By adjusting the valve lever you can vary the spray
Содержание SPRAYBORG
Страница 1: ...OPERATING MANUAL ENG V052015 ...
Страница 19: ...19 PARTS ...
Страница 21: ...21 PARTS ...
Страница 23: ...23 PARTS ...
Страница 25: ...25 PARTS 1 2 ...
Страница 27: ...27 PARTS ...
Страница 29: ...29 PARTS ...
Страница 31: ...31 PARTS 13 ...
Страница 33: ...33 PARTS 2 1 ...
Страница 35: ...35 PARTS ...
Страница 37: ...37 PARTS ...
Страница 39: ...39 NOTES ...