
5
STEP 3
Diagram 3
A)
Insert the Left and Right Handlebars
(6/7) onto the Handlebars Posts on
the Main Frame (1). Slide Pedals
(8)
onto the Handlebars (6/7) and
Secure it with four Button Head Bolts
(M8 x 45mm)(65), Arc Washer
(66),
Acorn Nut
(67).
STEP 4
NOTE
:
The Right Pedal (39) has
R
stamped on the end of the pedal shaft. The Right
Pedal
R
(39) has right hand threads and is tightened by turning clockwise.
The Left Pedal (11) has
L
stamped on the end of the pedal shaft. The Left
Pedal (11) has left hand threads and is tightened by turning counterclockwise.
Diagram 4
A) Install the Right Pedal
(39)
into the
Right
Crank(58)
as shown. Tighten the
pedal securely. Repeat on the left side
to attach the Left Pedal
(11)
to the Left
Crank
(17)
.
1
6
7
8
8
65
66
65
66
66
66
67
67
11
39
58