Install the Cable Management Arm (Optional)
the server into the rack until the slide-rail locks (on the front of the mounting
brackets) engage the slide-rail assemblies with an audible click.
Caution -
Before you install the optional cable management arm verify that the server is
securely mounted in the rack and that the slide-rail locks are engaged with the mounting
brackets.
Related Information
■
“Install the Cable Management Arm (Optional)” on page 54
Install the Cable Management Arm (Optional)
Follow this procedure to install the cable management arm (CMA), which you can use to
manage cables connected to the back of the server.
54
Oracle Servers X7-2 and X7-2L Installation Guide • October 2017
Содержание X7-2
Страница 1: ...Oracle Servers X7 2 and X7 2L Installation Guide Part No E72440 03 October 2017 ...
Страница 2: ......
Страница 10: ...10 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Страница 24: ...24 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Страница 34: ...34 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Страница 38: ...38 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Страница 70: ...70 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Страница 82: ...82 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Страница 118: ...118 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Страница 124: ...124 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Страница 144: ...144 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...