108
Sun Datacenter InfiniBand Switch 648 Installation Guide • May 2010
4. Connect the Infiniband cables.
See
“Attach Cables to the CXP Connectors” on page 109
.
Related Information
■
Switch Command Reference
,
fruinfo
command
■
“Display the CMC FRU ID Information” on page 88
■
“Display the Power Supply FRU ID Information” on page 91
■
“Display the Fabric Card FRU ID Information” on page 100
■
“Display the InfiniBand Cable FRU ID Information” on page 118
Connecting InfiniBand Cables
After verifying the line card status, you can begin cabling the line cards with the
InfiniBand cables. Perform the tasks in the following order:
Note –
Review
“InfiniBand Cable Cautions” on page 10
and
if you have not already done so.
Related Information
■
“Understanding InfiniBand Cabling” on page 9
■
“Understanding the Installation” on page 15
■
“Verifying the InfiniBand Fabric” on page 119
Step
Description
Links
1.
Attach cables to the CXP connectors.
“Attach Cables to the CXP Connectors” on
page 109
2.
Check the CXP connector status
LEDs.
“Check the CXP Connector Status LEDs” on
page 115
3.
Check link status.
“Check Link Status” on page 116
4.
Identify the CXP connector
addresses.
“Identify the CXP Connector Addresses” on
page 117
5.
Display InfiniBand Cable FRU ID
information.
“Display the InfiniBand Cable FRU ID
Information” on page 118
Содержание Sun Datacenter InfiniBand Switch 648
Страница 1: ...Sun Datacenter InfiniBand Switch 648 Installation Guide Part No 820 7738 12 May 2010 Revision A ...
Страница 8: ...viii Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 134: ...124 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...
Страница 140: ...130 Sun Datacenter InfiniBand Switch 648 Installation Guide May 2010 ...