Illustration Legend:
1 - Tape Drive With Fibre Channel Cable
2 - Expansion Module Cable
3 - Ethernet Cable
4 - Power Supply Cord
5 - Tape Drive With SAS Cable
3.
Connect the power cord to each installed power supply.
4.
Follow the power on procedures.
See
Validate the Component Installation
Validate the Component Installation
Verify the CRU or FRU was properly installed and that the library is fully functional.
1.
Power on the library (see
2.
Check the OK LED indicators on all CRUs.
3.
Verify that the library health state is operational from either the touch screen or the
remote interface (see
).
If the health state is degraded or failed, see
resolving the problem.
4.
Perform an operational check of replaced CRUs, as applicable:
•
Front Panel — Test the panel for general operation (locate light, touch screen,
open the mailslot, and so forth).
•
Module Controller — Confirm that the library recognizes the module controller
(Modules area of the touch screen or Library area of the SL150 remote
interface).
5.
Run the offline self tests from the remote interface (see
6.
Set the library to the online state (see
Place the Library Online or Offline
) and log
out of the remote interface.
7.
Run host application commands to ensure that the library and drive applications
are synchronized. See your host tape application documentation for guidance.
Return CRU Components to Oracle
Return the robot and tape drive tray CRUs to Oracle.
Instructions on how to return a CRU should have been provided with the CRU.
Dispose of all other CRUs or recycle them, as appropriate.
Lock the Robot for Shipment within a Rack
Lock the robot into place when shipping the library installed in the rack.