When the power cords are connected, the SP initializes and the power supply LEDs illuminate. After a
few minutes, the SP login prompt displays on the terminal device. At this time, the host is not initialized or
powered on.
Power On the Server
The following section describes how to power on the host after installing the server.
1.
At the terminal device, log in to the SP as
root
with a password of
changeme
.
After a brief delay, the Oracle Integrated Lights Out Manager (Oracle ILOM) prompt (
->
) is displayed.
For optimal security, change the root password. For more information about administration tasks such as
changing passwords, adding accounts, and setting account privileges, refer to the
SPARC T7 Series Servers
Administration Guide
and the Oracle ILOM documentation at:
http://www.oracle.com/goto/ilom/docs
By default, the SP is configured to use DHCP to obtain an IP address. If you plan to assign a static IP address
to the SP, refer to the
SPARC T7-2 Server Installation Guide
for instructions.
3