
Connecting Cables
These tasks describe how to connect cables before you attempt to boot the server.
Step
Description
Links
1.
Review the cabling requirements.
“Cabling Requirements” on page 51
2.
Review the front and rear panel connectors and ports.
“Front Panel Components (Installation)” on page 12
“Rear Panel Components (Installation)” on page 13
“Identifying Ports” on page 52
3.
Connect the management and data cables.
“Connecting Data and Management Cables” on page 58
4.
Secure the cables to the CMA.
“Secure Cables to the CMA” on page 62
“Verify Operation of Slide Rails and CMA” on page 47
Related Information
■
“Rear Panel Components (Installation)” on page 13
■
“Installing the Server” on page 25
■
“Powering On the Server for the First Time” on page 65
Cabling Requirements
Prior to cabling and powering on the server, gather the following network information:
■
Netmask
■
IP address for the SP
■
Gateway IP address
At a minimum, you must connect cables to these ports before powering-on the server for the
first time:
Connecting Cables
51
Содержание SPARC T7-1
Страница 1: ...SPARC T7 1 Server Installation Guide Part No E54979 01 October 2015 ...
Страница 2: ......
Страница 8: ...8 SPARC T7 1 Server Installation Guide October 2015 ...
Страница 20: ...20 SPARC T7 1 Server Installation Guide October 2015 ...
Страница 49: ...Verify Operation of Slide Rails and CMA Secure Cables to the CMA on page 62 Installing the Server 49 ...
Страница 50: ...50 SPARC T7 1 Server Installation Guide October 2015 ...
Страница 64: ...64 SPARC T7 1 Server Installation Guide October 2015 ...
Страница 84: ...84 SPARC T7 1 Server Installation Guide October 2015 ...