Powering On the Server for the First Time
145
2. Connect terminals or a terminal emulators (PC or workstation) to the two serial
connections.
Configure the terminal or terminal emulator with these settings:
■
9600 baud
■
8 bits
■
No parity
■
1 stop bit
■
No handshake
Note –
A null modem configuration is needed, meaning the transmit and receive
signals are reversed (crossed-over) for DTE to DTE communications. You can use the
supplied RJ-45 crossover adapters with a standard RJ-45 cable to achieve the null
modem configuration.
3. Press the Enter or Return key on the terminal devices connected to the SPs.
This action establishes the serial connections to the SER MGT ports on the server.
4. Continue with the installation by switching on the facility circuit breakers for
the first time.
See
“Switch On the Facility Circuit Breakers” on page 145
Related Information
■
■
“SP Network Addresses” on page 64
■
“Connect the SP Cables” on page 97
▼
Switch On the Facility Circuit Breakers
Caution –
This procedure provides the safest and preferred way of supplying
facility power to the server by switching on the facility circuit breakers in sequential
order. If you do not have access to the circuit breakers and the facility power grids
are on, connect the power cord IEC 60309 plugs to the live facility power grid sockets
in the order of the AC input filters.
1. Confirm that you have properly installed and secured the server.
See
Содержание sparc M5-32
Страница 1: ...SPARC M5 32 and SPARC M6 32 Servers Installation Guide Part No E41215 05 December 2014 ...
Страница 8: ...viii SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 16: ...6 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Front Components ...
Страница 18: ...8 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 Rear Components ...
Страница 21: ...Understanding the Server 11 FIGURE DCU Locations Rear of Server ...
Страница 43: ...Preparing the Site 33 FIGURE 4 Wire Power Cord AC Plug 460P9W Figure Legend 1 L1 2 L2 3 L3 4 Ground ...
Страница 51: ...Preparing the Site 41 ...
Страница 82: ...72 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 106: ...96 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...
Страница 182: ...172 SPARC M5 32 and SPARC M6 32 Servers Installation Guide December 2014 ...