Install the USB Board
Install the USB Board
Installing the USB board is a cold-service operation. You must power off the server before
installing the USB board.
1.
Consider your first step.
■
If you are replacing the USB board, remove the faulty or obsolete USB board first, then
“Remove the USB Board” on page 219
■
If you are installing the USB board as part of another component's removal or installation
2.
Connect the cable to the motherboard and the USB board.
3.
Review this information and complete these prerequisites in this order.
■
“Install the PSU Duct” on page 248
■
“Install the Air Duct” on page 249
■
“Secure the Drive Cage” on page 253
■
“Install the Filter” on page 91
4.
Position the USB board to the location where it installs into the chassis.
The USB connectors are forward and upward.
Servicing the USB Board
223
Содержание netra X5-2
Страница 1: ...Netra Server X5 2 Service Manual Part No E53601 03 October 2016 ...
Страница 2: ......
Страница 12: ...12 Netra Server X5 2 Service Manual October 2016 ...
Страница 20: ...20 Netra Server X5 2 Service Manual October 2016 ...
Страница 59: ...Using the Server Fault Remind Button Detecting and Managing Faults 59 ...
Страница 60: ...60 Netra Server X5 2 Service Manual October 2016 ...
Страница 123: ...Remove a Power Supply 4 Press the release tab to the left and pull on the handle Servicing Power Supplies 123 ...
Страница 128: ...128 Netra Server X5 2 Service Manual October 2016 ...
Страница 144: ...144 Netra Server X5 2 Service Manual October 2016 ...
Страница 148: ...148 Netra Server X5 2 Service Manual October 2016 ...
Страница 154: ...154 Netra Server X5 2 Service Manual October 2016 ...
Страница 180: ...180 Netra Server X5 2 Service Manual October 2016 ...
Страница 210: ...210 Netra Server X5 2 Service Manual October 2016 ...
Страница 226: ...226 Netra Server X5 2 Service Manual October 2016 ...
Страница 266: ...266 Netra Server X5 2 Service Manual October 2016 ...
Страница 274: ...274 Netra Server X5 2 Service Manual October 2016 ...