Install the USB Board
Install the USB Board
Installing the USB board is a cold-service operation. You must power off the server before
installing the USB board.
1.
Consider your first step.
■
If you are replacing the USB board, remove the faulty or obsolete USB board
first, then return to this procedure,
“Remove the USB Board” on page 109
■
If you are installing the USB board as part of another component's removal
or installation procedure, go to
2.
Connect the cable to the motherboard and the USB board.
3.
Review this information and complete these prerequisites in this order.
See:
■
“Install the PSU Duct” on page 240
Servicing the USB Board
113
Содержание Netra SPARC S7-2
Страница 1: ...Netra SPARC S7 2 Server Service Manual Part No E73207 03 February 2017 ...
Страница 2: ......
Страница 12: ...12 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 24: ...24 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 42: ...Server Fault Remind Button Operation 42 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 84: ...84 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 108: ...108 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 140: ...140 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 150: ...150 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 158: ...158 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 192: ...192 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 216: ...216 Netra SPARC S7 2 Server Service Manual February 2017 ...
Страница 258: ...258 Netra SPARC S7 2 Server Service Manual February 2017 ...