Connect AC Power Cords
Related Information
■
“Assemble the DC Input Power Cords” on page 76
■
“Connect DC Power Source” on page 80
■
“Power on the Server for the First Time” on page 83
Connect AC Power Cords
Prepare the power cords by routing them from the AC power source to the server.
Caution -
Do not attach power cables to the power supplies until you have connected the server
to a serial terminal or a terminal emulator (PC or workstation). The server goes into Standby
mode and Oracle ILOM on the SP initializes as soon as a power cable connects a power supply
to an external power source. System messages might be lost after 60 seconds if a terminal or
terminal emulator is not connected to the SER MGT port before power is applied.
Note -
Oracle ILOM signals a fault if both power supplies are not cabled at the same time, since
it will be a nonredundant condition. Do not be concerned with this fault in this situation.
1.
(Optional) Connect the chassis ground studs to earth ground.
See
“Connect the Chassis Ground Wire” on page 72
2.
Route the power cords from the AC power source to the rear of the server.
74
Netra SPARC S7-2 Server Installation Guide • January 2017
Содержание Netra SPARC S7-2
Страница 1: ...Netra SPARC S7 2 Server Installation Guide Part No E73206 03 January 2017 ...
Страница 2: ......
Страница 8: ...8 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 10: ...10 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 26: ...26 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 60: ...60 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 96: ...96 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 102: ...102 Netra SPARC S7 2 Server Installation Guide January 2017 ...