Handling Precautions
■
Rackmount kit
■
Package of mounting screws and nuts in assorted sizes to fit various types of racks and
cabinets
■
Earth grounding lug and two M5 nuts
■
Hardware, cables, documents, and connectors
■
Any optional components that were ordered with the server
Related Information
■
“Handling Precautions” on page 28
■
■
“Tools Needed for Installation” on page 29
■
■
“Stabilize the Rack” on page 33
Handling Precautions
Caution -
Deploy the antitilt bar on the equipment rack before beginning an installation.
Caution -
The server is heavy. Two people are required to lift and mount this server
into a rack enclosure when using the procedures in this document. See
.
Caution -
When completing a two-person procedure, always communicate your intentions
clearly before, during, and after each step to minimize confusion.
28
Netra SPARC S7-2 Server Installation Guide • January 2017
Содержание Netra SPARC S7-2
Страница 1: ...Netra SPARC S7 2 Server Installation Guide Part No E73206 03 January 2017 ...
Страница 2: ......
Страница 8: ...8 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 10: ...10 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 26: ...26 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 60: ...60 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 96: ...96 Netra SPARC S7 2 Server Installation Guide January 2017 ...
Страница 102: ...102 Netra SPARC S7 2 Server Installation Guide January 2017 ...