In
, NM2-GW represents a Sun Network QDR InfiniBand Gateway Switch
(leaf switches). Servers refers to compute nodes in the Exalogic machine. The Sun
Datacenter InfiniBand Switch 36, referred to as spine switch, is not connected.
C.4 Exalogic Full Rack
illustrates the cabling for a single Exalogic full rack.
Figure C-4 Exalogic Full Rack Network Connectivity
In
, NM2-GW represents a Sun Network QDR InfiniBand Gateway Switch
(leaf switches). Servers refers to compute nodes in the Exalogic machine. The Sun
Datacenter InfiniBand Switch 36, referred to as spine switch, is not connected.
Exalogic Full Rack
C-4 Oracle Exalogic Elastic Cloud Machine Owner's Guide
Содержание Exalogic Elastic Cloud
Страница 12: ...xii ...
Страница 70: ...Default Port Assignments 4 16 Machine Owner s Guide ...
Страница 82: ...Initial Network Configuration of Exalogic Machine 5 12 Machine Owner s Guide ...
Страница 102: ...Network Configuration Worksheets 6 20 Machine Owner s Guide ...
Страница 112: ...What Next 7 10 Machine Owner s Guide ...
Страница 134: ...Use the Phone Home Service to Manage the Storage Appliance 8 22 Machine Owner s Guide ...
Страница 162: ...Oracle Solaris Creating VNICs and Associating Them with VLANs 11 6 Machine Owner s Guide ...
Страница 248: ...Using Oracle Services in Oracle Enterprise Manager Ops Center 17 34 Oracle Exalogic Elastic Cloud Machine Owner s Guide ...
Страница 250: ...Using Oracle Services in Oracle Enterprise Manager Ops Center 17 36 Machine Owner s Guide ...
Страница 324: ...Power Distribution Unit Cabling Tables E 32 Machine Owner s Guide ...
Страница 338: ...Migrate a Zone to a New Host F 14 Machine Owner s Guide ...
Страница 342: ...Install Update and Remove RPMs Using Yum G 4 Machine Owner s Guide ...