Figure 5: Hazardous Substances
Pre-Installation Site Requirements
Before installing E5-APP-B cards into an EAGLE shelf, make sure that the requirements described in
both of the following sections have been met.
•
•
Grounding and Power Requirements
Generic Site Requirements
Ensure that the site where the product will be installed conforms to the specifications listed in the
following sections. These specifications are standard telephony industry requirements for equipment
installation.
Fire Protection
Local fire protection codes must be satisfied in the equipment room where the system is to be located.
24
910-6535-001 Revision D, February 2014
Safety and Pre-Installation Requirements
Hardware and Installation Manual