Stabilize the Rack (Leveling Feet)
Related Information
■
“Installation Task Overview” on page 31
■
■
■
“Stabilize the Rack (Leveling Feet)” on page 36
Stabilize the Rack (Leveling Feet)
After you move the rack to the installation site, stabilize the rack using the leveling feet to
ensure it does not move or tip over when you install equipment.
Lower the four leveling feet to share the load with the casters. This increases the footprint of the
rack which improves stability and helps prevent rack movement.
1.
Stabilize the rack by lowering the four leveling feet to the floor, using a 6-mm hex
wrench or your fingers.
2.
Lock the leveling feet using an 18-mm open wrench.
Caution -
When moving the rack to a new location, including repacking, verify that the leveling
feet are up before moving the rack.
Related Information
■
“Installation Task Overview” on page 31
■
■
36
Oracle Rack Cabinet 1242 User's Guide • July 2018
Содержание 1242
Страница 1: ...Oracle Rack Cabinet 1242 User s Guide Part No E87280 03 July 2018 ...
Страница 2: ......
Страница 8: ...8 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Страница 10: ...10 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Страница 14: ...14 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Страница 30: ...30 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Страница 54: ...Power On the Rack Retract the Anti tilt Bar on page 52 54 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Страница 84: ...84 Oracle Rack Cabinet 1242 User s Guide July 2018 ...