
Page
7
4.0 Testing of the NTS-PU after a separation
4.1 Test procedure
a. Process environment
Make sure the shut off valves on both sides to the NTS-PU are closed
... that the line is depressurized
... that the line is drained / purged
b. Optical inspection
Check for physical damage to the coupler
Check seal rings for damage
Check all release parts for damage
Check face o-rings (where the two NTS-PU halves mate) for damage
4.2 Evaluation of the damage and consequences
a. Minor damage
Repair on site possible by local crew
e.g. defective o-rings between the coupler halves or damaged seal ring
Use only original spare parts
b. More severe damage
e.g. damage to the housing or to any of the moving parts
Please contact the your OPW representative