background image

OPW 1-3100 Series Spill Container 

 

Page 30 

OPERATION INSTRUCTIONS: 

 

Step 1: 

(See Figure 2) 

Attach vacuum pump to gauge assembly using the 
Quick Connect Fitting. 
 

 

Figure 2 

 

Step 2: 

(See Figure 3) 

Make sure Test Valve is clean. 
Connect Test Adaptor to Test Valve on OPW 1-3100 
Series Double Wall Spill Container. 
 

Step 3: 

(See Figure 2) 

Make sure that the ball valve on the DW-VAC-TEST 
is open and use the pump to increase the vacuum to 
-15 inches of water column as displayed on vacuum 
gauge.  
 

Step 4:  

Close ball valve when -15 inches of water column is 
displayed on the vacuum gauge.  Allow spill 
container to sit for 30 seconds.  Refill spill container 
to -15 inches of water column.

 

Step 5: 

Leave the spill container undisturbed for 5 minutes 
while under vacuum. 

 
Step 6: 

Check vacuum gauge after 5 minutes.  If gauge 
does not show 12 or more inches of water column, 
the spill container has failed the test.

 

 

 

Figure 3 

 

NOTE: 

 Keep the temperature of the unit constant 

during testing.  Fluctuations in temperature of the 
unit could result in bias results.

 

 

 

P.O. Box 405003, Cincinnati, Ohio 45240-5003 

1-800-422-2525 Domestically  
513-870-3315  Internationally 

www.opw-fc.com 

Copyright, 2008 - OPW Fueling Components Inc,.Cincinnati, OH 

Printed in U.S.A. p/n 202383 

– 04/08

 

 

 

 

 

Quick 
Connect 
Fitting 

Test Valve   

 

Test Adaptor 

Отзывы: