background image

OPW 623V Pressure / Vacuum Vent 

 

Page 2 

OPW 623V Pressure / Vacuum Vent Valve

 

INSTALLATION INSTRUCTIONS:

 

 

Step1.  

Deburr and thoroughly clean vent pipe.  Apply pipe 
dope to vent pipe threads.  Pipe dope to be a non-
hardening, gasoline resistant pipe thread seal 
compound. 
 

Step 2: 

(See Figure 1) 

Screw the vent assembly onto the vent pipe and 
torque to 35 ft.-lbs minimum to 55 ft-lbs maximum.  
Use the flats on the pipe adaptor only, 

Do not wrench 

on the composite valve assembly. 

 

NOTE: NEVER PAINT OR COVER THE VENT 

 

 

Vent Pipe 

Pipe Dope 

Vent 

Assembly 

 

 
 

 
Operation and Maintenance: 

Annual maintenance is required to keep the vent 
operating satisfactorily.  Remove and inspect filter 
screens – clean or replace as necessary.  
 

Upper Screen Maintenance 

1.  Remove vent top by depressing tabs as indicated 

in Fig. 2, and lift top upward.  Screen will slip up 
and out of valve.   

2.  Clean or replace filter screen (P/N H14895M) as 

necessary and reinstall Fig. 3. 

3.  Reinstall vent top by reinserting into the body.  Be 

sure the tabs are inside the valve body, and then 
rotate top until the tabs snap into place 

 

PUSH

 

 
 

 
 

 

Vent Top 

Upper 
Screen

Pipe 
Adaptor

Valve 
Body

 

 
 

 
 

Figure 1 

Figure 3 

Figure 2 

Отзывы: