All components must be correctly positioned for the first commissioning of the entire system. Since all
components are already pre-wired, they only have to be brought into the correct position. A suitable position
for glass measurement is between the furnace and the immediately following annealing furnace. In most
cases, there is a small slot there, which allows a contactless temperature measurement. The glass is
transported on horizontal rollers.
shows a classical glass tempering process.
Figure 6:
Process of glass production
Содержание Bottom-Up GIS 450i G7
Страница 1: ...Operators Manual Bottom Up GIS 640i G7 and 450i G7 Glass Inspection System ...
Страница 11: ... Technical Data 11 Figure 1 Dimensions mm shutter system ...
Страница 12: ... 12 Figure 2 Dimensions mm control cabinet ...
Страница 13: ... Technical Data 13 Figure 3 Dimensions mm CTL 4M ...
Страница 20: ... 20 CTL 4M FF optics Figure 5 spot size diagram ...
Страница 27: ... Installation 27 Figure 10 camera distance ...
Страница 44: ... 44 Figure 27 Linescan in PIX Connect software customized Layout ...
Страница 52: ... 52 Appendix A Control cabinet Figure 34 Wiring diagram of control cabinet ...
Страница 57: ...Bottom Up GIS MA E2022 04 A ...