background image

OP280MT

5 of 8

On | Off Button

Turns the unit on or off. When turned on the unit starts up with 

sequence #1. This is indicated with LED #1 blinking. The unit will 

stay on until turned off again. 

Pressing the On/Off button for a few seconds will cause the unit 

to display the level of the battery charge. The number of LEDs 

illuminated is proportional to the battery life (12 LEDs=full charge).

Select | Advance

When the LED is blinking, pressing this button turns on the first 

combination of lasers for the selected sequence. The LED will go 

from blinking to solid.

When the unit is operating the lasers (LED solid) pressing this button 

will advance to the next sequence step. The next combination of 

lasers will turn on.

If the Advance button is pressed and held for a few seconds 

the unit will automatically cycle through the sequence steps. 

This automatic play of the sequence is stopped by pressing the 

Advance button again.

Select Sequence

When the LED is blinking, pressing this button switches to the next 

programmed sequence. The unit stores up to twelve sequences, 

4 pre-programmed and 8 user programmable. The sequences are 

programmed using the OPL-280MT application software. 

Supported OP280MTs are configured to work in conjunction with the 

OP480MT to quickly analyze the cable type (A, B, C, etc).  To put the 

OP280MT in the proper mode to function with the OP480MT, press 

and hold the “Select Sequence” button for 5 seconds and release. 

When ready, the unit will flash LED #1 until the button is released. In 

this mode the LASERs will quickly cycle through all available LASER 

sources and be easily recognized by an OP480MT.

Front Panel Operation

Содержание OP280MT

Страница 1: ...Ribbon Visual Fault Locator Instruction Manual OP280MT www optotest com 1 805 987 1700...

Страница 2: ...intained in strict confidence No element or detail of this manual is to be spuriously used or disclosed without the express written permission of OptoTest Corporation All rights are reserved No part o...

Страница 3: ...OP280MT 2 of 8 Table of Contents Overview 3 Initial Preparation 4 Front Panel Operation 5 Sequences 6 Charging the OP280MT 7 Care Maintenance 7 USB Control of the OP280MT 7 Warranty Information 8...

Страница 4: ...LASERs The Ribbon Fiber Visual Fault Locator can be used for single mode or multimode applications and is pre programmed with various sequences for automatic or individual scanning of each fiber User...

Страница 5: ...luded with the original shipment contact OptoTest of their nearest distributor Please retain the shipping container in case re shipment is required for any reason Damaged In Shipment All instruments a...

Страница 6: ...dvance button is pressed and held for a few seconds the unit will automatically cycle through the sequence steps This automatic play of the sequence is stopped by pressing the Advance button again Sel...

Страница 7: ...ng with fiber 1 then 2 ending with fiber 12 The sequences 5 thru 12 are user programmable The OP280MT can be programmed with any standard Windows based computer connected to the OP280MT via USB cable...

Страница 8: ...uipment it is essential that the optical interface of BOTH the cable being inserted into the OP280MT as well as the MT bulkhead of the OP280MT is kept clean For cleaning MT ferrules the MT Clean produ...

Страница 9: ...or replace any product that proves to be defective To exercise this warranty contact OptoTest Corp headquarters You will be given prompt assistance and return instructions Repairs will be made and the...

Страница 10: ...OP280MT 9 of 8...

Страница 11: ...For Application Notes more detailed Testing Instructions and the most up to date OptoTest News go to www optobuzz com...

Страница 12: ...www optotest com 1 805 987 1700...

Отзывы: