
Confidential
4-9
HD25/HD25LV/HD25e
- Screen size: No concern
- Display mode: ECO mode
After repairing each unit, a Ru
n-in test is necessary (refer to the below table).
Symptom
Run-in Time
Normal repair
2 hours
NFF
4 hours
Auto shutdown
6 hours
- Get into Burn-In Mode
* Cycle setting is based on the defect symptoms. ie: If it is NFF, the run-in time is 4 hours. You have
to set the lamp on for 50 min. and lamp off for 10 min for 4 cycles.
4-4-5 HDMI Port Test
Procedure
- Test equipment: DVD Player with HDMI output.
- Test signal: 720p, 1080p, 1080i
Inspection item
- HDMI performance test.
Inspection Distance - 1.4 M ~1.6M.
Criteria
- Ensure the image is well performed and the
color can not discolor.
- Check whether "mute" is normal.
4-5-6 3D Test
Procedure
- Test equipment: 1. Blue-Ray DVD player & 3D format CD
- Test signal: 1080i�50Hz
�50Hz
Inspection item - 3D test (HDMI)
Inspection Distance - 3~5 M
Criteria
-
The image should not appear noise, flicker shadow, shocking,
abnormal color.
4-5 Run In Test
- Temperature: 15°C~35°C
- Circumstance brightness: Normal environment
Содержание HD25
Страница 42: ...HD25 HD25LV HD25e Confidential 5 11 7 Click Next 8 The program is being installed 9 Click Next ...
Страница 48: ...HD25 HD25LV HD25e Confidential 5 17 10 Get into the service mode to check the MSP430 firmware version ...
Страница 50: ...HD25 HD25LV HD25e Confidential 7 8 5 12 14 1 2 13 3 15 10 9 11 4 Appendix A D C HD25 HD25LV HD25e 6 ...
Страница 62: ...Confidential 13 HD25 HD25LV HD25e Assy 8525 Fan Shoelding Module 1 4 3 5 6 7 2 8 9 ...
Страница 64: ...Confidential 15 HD25 HD25LV HD25e Assy Packing Drawing ...