Confidential
4-8
GT750
4-4 Run In Test
- Temperature: 15°C~35°C
- Circumstance brightness: Normal environment
- Screen size: No concern
- Display mode: ECO mode
After repairing each unit, a Ru
n-in test is necessary (refer to the below table).
Symptom
Run-in Time
Normal repair
2 hours
NFF
4 hours
Auto shutdown
6 hours
- Get into Burn-In Mode
* Cycle setting is based on the defect symptoms. ie: If it is NFF, the run-in time is 4 hours. You have
to set the lamp on for 50 min. and lamp off for 10 min for 4 cycles.
4-3-6 3D Test
Procedure
- Test equipment: 1. DVD Player & PS3 &HQFS format CD
or 2. PC with 3D Graphic card
- Test signal: 1080p�24Hz
�24Hz(for 3D movie)
720p�60HZ(for 3D game)
Inspection item - 3D test
Inspection Distance - 3~5 M
Criteria
-
The image should not appear noise, flicker shadow, shocking,
abnormal color.
Содержание GT750
Страница 40: ...GT750 Confidential IV 2 3 4 5 13 18 12 16 10 14 15 9 7 8 6 1 11 ASSY BOTTOM COVER MODULE ...
Страница 42: ...GT750 Confidential VI ASSY MAIN BOARD AND IO BOARD MODULE ...
Страница 45: ...GT750 Confidential IX ASSY OPTICAL ENGINE MODULE ...
Страница 50: ...GT750 Confidential XIV A K ...