4-1
EP719 / EP716 / EP719R / EP716R /
EP719P / EP716P
Chapter 4
Function Test & Alignment Procedure
4-1
Test Equipment
-
IBM PC with XGA resolution (Color Video Signal & Pattern Generator)
-
DVD player with Multi-system (NTSC/PAL/SECAM)
-
HDTV Tuner or Source (480p, 720p, 1080i), equipped with “S-Video”,
“Component”, “Composite” interface.
-
Minolta CL-100
-
Quantum Data 802B or CHROMA2327
4-2
Test Condition
-
Circumstance Brightness : Dark room less than 2.5 lux.
-
Inspection Distance : 1.5m~3m for functional inspection
-
Screen Size : 60 inches diagonal (wide)
-
After repairing each EP719, the unit should be burn-in (Refer to the table
below).
Symptom
Burn-in Time
Normal Repair
2 Hours
NFF
4 Hours
Auto Shutdown
6 Hours
Содержание EP716
Страница 42: ...5 4 EP719 EP716 EP719R EP716R EP719P EP716P 4 Click Next button 1 2 5 Choose All icon then click Next button...
Страница 43: ...5 5 EP719 EP716 EP719R EP716R EP719P EP716P 6 Click Next button 7 The program is executing Initializing status...
Страница 59: ...EP719 EP716 EP719R EP716R EP719P EP716P 7 2 Appendix Series Appendix B Exploded Overview I EP719 Unit...
Страница 61: ...EP719 EP716 EP719R EP716R EP719P EP716P 7 4 II ENGINE TOP COVER MODULE...
Страница 73: ...EP719 EP716 EP719R EP716R EP719P EP716P 7 16 XII PACKING PROCEDURE DRAWING...
Страница 75: ...EP719 EP716 EP719R EP716R EP719P EP716P 7 18 EP716 Unit...
Страница 78: ...7 21 EP719 EP716 EP719R EP716R EP719P EP716P EP716 Engine Top Cover Module...