background image

 

Set springs symmetrically (long side to long size and short side to short side) and keep frame and 

screen centered before springs all hooked-on. 

 

 

 

Содержание ALR100

Страница 1: ...g Instructions Main inner frame x 4 Outer frame x 4 L Shape metal parts x 4 Wall hanging parts x 2 M5 x 15 mm screw x 8 M5 x 8 mm screw x 16 Adjusting screw x 2 Springs x N units depends on sizes Screw for wall hanging parts x 4 Plastic plugs x 4 ...

Страница 2: ...2 Assembling Instruction Step1 Unpack the box on an empty large table top or clean floor Place PE film on the ground or table top and set L shape metal parts main frame parts ready for assembling ...

Страница 3: ...metal parts and M5 x 8mm screws Screw the four corners first but do not make to tight initially then screw the main frame tight after it is fully adjusted and matched Main frame assembled Step3 Screen assembling Take out screen sheet from paper tube ...

Страница 4: ...ust it to be in a centered position of the screen spring the four corners first and do the rest from long to short sides of the frame accordingly please slightly press the main frame while springing the screen to avoid film slip causing unevenness of each side corner Please match the screen with the lines of the main frame red arrow marks ...

Страница 5: ...5 Set springs symmetrically long side to long size and short side to short side and keep frame and screen centered before springs all hooked on ...

Страница 6: ...6 Step 5 Make sure the outer frames are 45 degrees matched with main frame and screw M5 x 15mm screws outer frames can be slightly adjusted for smooth corner purpose Total Assembling Complete ...

Страница 7: ... down It is recommended to set the height between screen bottom and the ground to be 110cm 120cm for better projecting performance If the wall is uneven users may adjust the position between frame and wall by using adjusting screws Attention Please make sure the screen is not hanged upside down by checking the DOWNSIDE label ...

Отзывы: