OPS70 Simple Install Guide
8
Step 7a
Connect a piece of 3/8” blue tubing to the
Optimized Water Fitting from the processor.
Connect the other end to the Tank Tee as
shown below.
Step 7b
The remaining connection at the Tank Tee is the
Optimized Water Outlet. Insert the barbed end
of the connector fitting into the 1/2” gray hose
and secure with clamp. Insert into the Tank Tee
as shown. This will later be the water supply
connection to downstream equipment.
Do not connect to equipment at this time.
v
Make Optimized Water Connections
Step 7a
Step 7a
Step 7b
Connector
Fitting