
User Manual – eSX
OptiPro Systems, LLC.
Page 82 of 111
Last Modified: 8/27/2014
7.6.4
Executing a Process in a Job
After loading an existing job it is advised to re-probe tool lengths and part reception height before
processing. Once they have been setup and checked by a qualified operator, the job is ready to run.
Figure 7-48: Job HOME Screen
1.
See Section 7.6.1 for loading an existing job and Section 7.6.3 for modifying an existing job or
creating a new one.
2.
After loading an existing job it is advised to re-probe tool lengths and part reception height
before processing. Once they have been setup and checked by a qualified operator, the job is
ready to run.
3.
Once a job has been created or loaded and the tools and parts have been probed, tap the
checkbox of the processes to be executed.
4.
Tap [RUN] in the Function Bar.
5.
The screen will switch to Automatic Mode and the process will start by pressing the
CYCLE
START
button on the Jog Panel (Figure 5-6). See Section 7.4 for more information regarding
Automatic Mode.
In Emergencies: Press the
E-STOP
button
on the Jog Panel (Figure 5-9) in any situation in which the
operator feels it is warranted to immediately halt axis motion. See Section 6.3 for more information
regarding E-Stop.