Machine substructure

Version 1.0  dated 2019-09-04

Page 8

Translation of the original instructions

MST1

GB

machine-

base_3

44040

9_G

B.f

m

OPTIMUM

M A S C H I N E N   -   G E R M A N Y

®

2.2

Assembly and installation

2.2.1

Anchor-free assembly

This must be done by laying down a strong base on each support of the levelling points,
between the foundation and the machine foot.

2.2.2

Installation with levelling discs

Optional levelling discs

Attaching of 6 pieces SE1 levelling disc on levelling
points between the foundation and machine stand.

Dimension of levelling discs

2.2.3

Installation with vibration dampers

Optional vibration dampers

Attaching of 6 pieces SE55 vibration dampers on levelling
points between the foundation and machine stand.

In order to obtain optimum anti-slip protection, the subfloor
must be free of oil and grease before the machine or sys-
tem is installed. 

CAUTION!

The max. load per element refers to the sum of static
plus dynamic forces. The machine must not be moved after the machine has been
lowered!  

Jackscrew

Counternut

A

B

C

D

E

A

B [mm]

C [mm]

D [mm]

E [mm]

SE1

M12

70

10

32

120

SE2

M16

90

12

35

160

SE3

M20

130

12

40

185

Содержание 3440409

Страница 1: ...chubfachausbau Montage und Installation Machine substructure Drawer Removal Assembly and installation Abmessungen Dimension Ersatzteile Spare parts Maschinenunterbau f r Drehmaschinen Machine base for...

Страница 2: ...1 Maschinenunterbau Um die Maschine mit dem Unterbau zu befestigen sind zuerst die Schubf cher auszubauen 1 1 Schubfachausbau Das obere Schubfach komplett rausziehen Das Schubfach ist jeweils links un...

Страница 3: ...r Reihenfolge vor Der Unterbau 2 mit den Schubf chern wird links plaziert Der Unterbau 3 mit der T re wird rechts plaziert Die Sp newanne 4 auf die beiden Unterbauten setzen und Anhand der Durchgangsb...

Страница 4: ...nenunterbau Abmessungen Nivellierteller 1 2 3 Aufstellung mit Vibrationsd mpfer Optionale Vibrationsd mpfer Anbringung von 6 St ck SE55 Vibrationsd mpfer an jedem Auflagepunkt der Nivellierpunkte zwis...

Страница 5: ...be mu dabei in der Durchgangsbohrung senkrecht stehen Diese Vorbereitungen an allen Abst tzpunkten ausf hren und Maschine jetzt vorsichtig weiter absenken und ber die Nivelliermutter durch Gegenhalten...

Страница 6: ...IMUM M A S C H I N E N G E R M A N Y 2 Machine substructure To screw the machine onto the substructure first remove the drawers 2 1 Drawer Removal Pull out completely the upper drawer The drawer is pr...

Страница 7: ...reverse order The substructure 2 with the drawers is placed on the left The substructure 3 with the door is placed on the right Place the chip tray 4 on the two substructures and align using the thro...

Страница 8: ...c on levelling points between the foundation and machine stand Dimension of levelling discs 2 2 3 Installation with vibration dampers Optional vibration dampers Attaching of 6 pieces SE55 vibration da...

Страница 9: ...r of the levelling disc 3 The screw must be vertical in the through hole Carry out these preparations at all support points and now carefully lower the machine further and level it via the levelling n...

Страница 10: ...chine base_dimension_3440409 fm OPTIMUM M A S C H I N E N G E R M A N Y 3 Abmessungen Dimension A A 0 1 Unterbau Gezeichnet Kontrolliert Norm Datum Name 03 04 2013 schell A A 150 180 330 60 120 330 38...

Страница 11: ...MER ANZAHL OBJEKT 0344040901 Unterbau rechts 1 1 0344040902 Unterbau links 1 2 0344040903 Blech A 1 3 0344040904 Blech B 1 4 Schraube M6 x 12 7 5 Sechskantmutter M6 3 6 Scheibe DIN 125 A 6 4 10 7 0344...

Страница 12: ...Ersatzteile Spare parts Version 1 0 2019 09 04 12 Originalbetriebsanleitung MST1 GB machine base_dimension_3440409 fm OPTIMUM M A S C H I N E N G E R M A N Y...

Отзывы: