background image

HEAVY DUTY ELECTROMECHANICAL

SLIDING GATE OPERATORS

ISO   9001: 2008

EN ISO 14001: 2004

SECURITY SYSTEMS

Sliding Gates

&

Operators

INSTALLATION INSTRUCTIONS

www

.

optima-engineering

.

com

Содержание ESGO 4000

Страница 1: ...HEAVY DUTY ELECTROMECHANICAL SLIDING GATE OPERATORS ISO 9001 2008 EN ISO 14001 2004 SECURITY SYSTEMS Sliding Gates Operators INSTALLATION INSTRUCTIONS www optima engineering com ...

Страница 2: ...TEM COMPONENTS 8 2 1 Mechanical 8 2 2 Cabinet Features 9 2 3 Electrical and Electronically Components 9 2 3 1 Usage of Frequency Controller 12 3 INSTALLATION 13 3 1 Preparation and Installation of Foundation 14 4 OPERATION INSTRUCTIONS 16 4 1 Operation of the Electromechanical Sliding Gate Operator 16 4 1 1 Manuel Release of the Electromechanical Sliding Gate Operator 16 5 MAINTENANCE 16 6 PRACTIC...

Страница 3: ...3 SYSTEM SPECIFICATIONS and DATASHEET www optima engineering com ...

Страница 4: ...ll the product in the environment where there are explosives and causes of fire Keep the package stuff away from the children Before installation be sure that the product has not damaged Before mechanical installation be sure that the ground where the electromechanical sliding gate operator to be installed is strong enough If not please strengthen the ground with proper foundation With weak founda...

Страница 5: ...en maintenance is needed For the efficient working of the product please follow the maintenance instructions given by the manufacturer Maintenance must be done only by skilled technicians Periodically make maintenance and check if the product is working properly When needed use only the spare parts manufactured by the manufacturer for maintenance Note every maintenance onto a card and spare that c...

Страница 6: ...tc can be used to start or stop the electromechanical sliding gate operator with the help of PLC Programmable Logical Control controls Closing the sliding gate can be utilized by automatic time delay facility as well as inputs from other sources Time delay can be adjusted between any time interval by PLC Optionally by integrating freguency controller to the control electronics movement control of ...

Страница 7: ... bearings aluminum injevtion casing irreversible 1 1 12 Limit Switches Two seperate heavy duty proximity 1 1 13 Mounting By seperate galvanized anchoring plate 1 1 14 Auto Close Adjustible time period 1 1 15 PLC 24 VDC Password protected programmable software operated PLC card user interface 6 inputs and 3 outputs are used 1 1 16 Keyboard Depending on the priority of the Control Panel this switch ...

Страница 8: ...forming the drive unit namely gears motor etc are very precisely manufactured so that they can stand harsh environmental conditions All the parts are hot dip galvanized 60 micrometers Rust Prevention Epoxy Coated painted in order to prevent rusting The electromechanical sliding gate operator will be installed in reinforced concrete foundation 1 Helical Gears 2 Transmitter Rod 3 Alignment Bearings ...

Страница 9: ...kind of card readers biometric readers like fingerprint or hand shape radio control on off switches or key switches etc Besides safety accessories like inductive loop detectors photocells flashing lights or red green lights can be integrated to control electronics very easily Power requirement of the electromechanical sliding gate operator is 220 VAC 50 60 Hz As you see below the drawing we use a ...

Страница 10: ...g gate automatically It is enough to push the button ONCE in order to operate the electromechanical sliding gate from Cabinet Control Panel No other comment could be given until the process is accomplished 3 Auto Close Closing the electromechanical sliding gate automatically It is enough to push the button ONCE in order to operate the electromechanical sliding gate from Cabinet Control Panel No ot...

Страница 11: ...t switch supply the opened and closed of sliding gate systematically 7 Slinding Gate Mechanism Explained at the mechanism component part 8 Telemechanic Zelio PLC Card 24 VDC Password protected programmable software operated PLC card user interface 8 inputs and 4 outputs are used 9 Terminal Group A 220V Input a 220 VAC b Neutral B Motor Output a U b V c W www optima engineering com ...

Страница 12: ... d 24VDC e 24VDC 10 Frequency Convertor If you want to change frequency value you can change it easily by frequency convertor 11 Power Supply AC DC Converter As the energy supplied to the system is from mono phase 220 VAC this device changes the voltage to 24 VDC in order to supply power to some of the components in the system www optima engineering com ...

Страница 13: ...TALLATION Picture 6 Plugging of the upper part Take off 4 pieces of the metric 6 bolts and nuts using Allen key no 5 and plug off the upper plate of the electromechanical sliding gate www optima engineering com ...

Страница 14: ... foundation before pouring the concrete Wait for one day for the concrete foundation to be ready for the mounting of the sliding gate operator onto it In the rainy and cold weather conditions the casing time of the concrete will be longer Fig 1 Plate Foundation Preperation abd Installation of the Anchoring Before mounting the sliding gate mechanism onto the anchoring plate be sure that the concret...

Страница 15: ...15 OPERATION and MAINTENANCE www optima engineering com ...

Страница 16: ...ectromechanical Sliding Gate Opereator connect the electric power and data cables of Safety Photocell to the terminal 5 If there is a Card Reader System in the Electromechanical Sliding Gate Opereator connect the electric power and data cables of Card Reader System to the terminal 6 Make sure the emergency stop buttons on the Cabinet Control Panel Picture 4 are not pressed 7 Connect the 220 VAC ca...

Страница 17: ...ding Gate Operator will first move slowly and then accelerate the sliding gate and finally it will be stop slowly by frequency convertor This feature is an optional accessory 5 MAINTENANCE In the electromechanical sliding gate operator anti friction bearings are used Thus it does not need frequent lubrication However for harsh outdoor working conditions and high frequency usage it is advised that ...

Страница 18: ...ections Check PLC programmable logical control cable connections If the PLC is OK but electromechanical sliding gate operator is not running check motor input cable connections If electromechanical sliding gate operator seems not to be working normally check photocell cable connections If the system is not running after all these controls please contact with the manufacturer www optima engineering...

Страница 19: ...ive 93 68 EEC low voltage Directive 89 336 EEC and directive 92 31 EEC and directive 93 68 EEC electromagnetic compatibility And also are in confirmity with the following national standards TS EN 292 1 January 1996 Standard TS EN 292 2 January 1996 Standard TS EN 563 April 1997 Standard TS EN 418 November 1995 Standard TS EN 60204 3 1 December 1995 Standard TS EN 50082 1 April 1995 Standard TS EN ...

Страница 20: ... ...

Страница 21: ... ...

Отзывы: