S P E C I A L F U N C T I O N S
114 / 216
XS10000_manual_ger_eng_it_V1.1.2.doc
R. Kistler
1. Connect the UPS systems using the parallel cable. The maxi-
mum length between the UPS systems is 3 m. Do not yet
switch on the UPS systems.
2. Connect the inputs and outputs of the UPS system according
to Figure 29 and Figure 30 with the individual power switches
(2-pole in each case for L and N, power switch is not included
in the scope of delivery). Make sure that all power switches
are opened.
3. In addition, ONLINE recommends installing an additional
maintenance switch (not included in the scope of delivery) for
the network (see Figure 30).
4. Insert the jumper between L2 and JP on each UPS system
(see Figure 29).
5. The connected cables for input and output must at least corre-
spond to the cable cross-sections from Table 2.
NOTE
For a line length under 10 m, the line lengths to the UPS sys-
tems may differ by a maximum of 20%
For a line length above 10 m, the line lengths to the UPS
systems may differ by a maximum of 5%
Figure 29: Connection plan 1 parallel switching
Содержание XANTO S 10000
Страница 2: ...2 216 XS6000 XS10000_manual_ger_eng_it_V1 1 2 doc R Kistler ...
Страница 70: ...T E C H N I S C H E D A T E N 70 216 XS6000 XS10000_manual_ger_eng_it_V1 1 2 doc R Kistler 9 3 CE Bestätigung ...
Страница 72: ...72 216 XS6000 XS10000_manual_ger_eng_it_V1 1 2 doc R Kistler ...
Страница 74: ...74 216 XS6000 XS10000_manual_ger_eng_it_V1 1 2 doc R Kistler ...
Страница 142: ...T E C H N I C A L D A T A 142 216 XS6000 XS10000_manual_ger_eng_it_V1 1 2 doc R Kistler 9 3 CE conformity ...
Страница 144: ...144 216 XS6000 XS10000_manual_ger_eng_it_V1 1 2 doc R Kistler ...
Страница 146: ...146 216 XS6000 XS10000_manual_ger_eng_it_V1 1 2 doc R Kistler ...
Страница 214: ...D A T I T E C N I C I 214 216 XS6000 XS10000_manual_ger_eng_it_V1 1 2 doc R Kistler 9 3 Dichiarazione CE ...
Страница 216: ...216 216 XS6000 XS10000_manual_ger_eng_it_V1 1 2 doc R Kistler ...