
14
The following calibration pattern will show on the screen:
Wait a while, then you will hear a prompt tone. That indicates the completion of the auto
calibration and the CM2 PRO system is
now ready to operate.
Manual Calibrate
Click or right click the system tray on the
icon . On the pop-up
menu - Click
“Calibrate”. After that, a flashing green dot will appear on the top left of the project image.
Please do not move the receiver or projector during calibration. Place the Primary E-Pen
tip at the center of the green dot (on the projection screen) and press for about 0.5 to 1
second. This indicates calibration of this sampling point has been completed. Then, next
dot will appear automatically, repeat sampling until all the dots turn black.
Then you will hear a prompt tone. That indicates the completion of the manual position
calibration and the CM2 PRO system is now ready to operate.