background image

5

1

.

Main

 

interface

 

data:

2

.

Function

 

setting

 

interface:

Back

 

panel

 

illustration

Ⅴ.

Connection

 

way

 

of

 

input & output

Connect with AC input and load output by connecting terminal, load oputput 

can connect both by terminal blocks and output plug.

Note: Output

 

plug

 

only

 

can

 

connect

 

with

 

each

 

load

 

less

 

than

 

1500W

.

DC 

-

DC

 

+

AC INPUT

AC OUTPUT

Battery negative polarity connection 

AC

 

input

 

connection

Universal

 

socket

 

output pr connection terminal output 

Battery

 

positive

 

polarity

 

connection 

USE ONLY WITH 250V FUSE

AC

 

input

 

and

 

output

 

over current

 

protection

DC OUTPUT

DC

 

output terminal 

SOLAR

 

IN

Solar

 

panels and connection

1.1500W / 2000W / 3000W

 

Series

 

wiring

 

diagram

6

L

N

L

N

Rs232

Main

 

interface

Solar

 

power

Solar

 

charging current

Output

 

frequency

Load capacity

Solar

 

panel

 

voltage

Battery

 

capacity

Note

Inverter

 

without

 

the data of the solar panels.

Back

 

to

 

interface

Working

 

mode

Battery

 

type

Buzzer

Charging

 

current

Содержание LSI Series

Страница 1: ...SI Series 1 5 20KW Pure Sine Wave Low Frequency Solar Hybrid UPS Inverter with built in PWM Solar Charger Fax 86 757 8258 9791 Tel 86 757 8258 0189...

Страница 2: ...of the front panel the rear panel fan outlet and the side of the machine are well ventilated 3 The environment temperature should remain 0 40 4 If the machine is operated under low temperature enviro...

Страница 3: ...the inverter capacity otherwise the machine will continue to startup and shutdown 03 Battery Mode Battery priority to supply the load when battery is low of power or voltage will automatically switch...

Страница 4: ...connection AC input connection Universal socket output pr connection terminal output Battery positive polarity connection USE ONLY WITH 250V FUSE AC input and output over current protection DC OUTPUT...

Страница 5: ...eries wiring diagram 3 10kW 15kW 20kW Series wiring diagram BATTERY IN ON OFF BATTERY CHARGER INPUT PROTECT Rs232 A C INPUT A C OUTPUT BATTERY IN ON OFF BATTERY Rs232 A C INPUT A C OUTPUT ON OFF AC IN...

Страница 6: ...NPUT PROTECT Rs232 A C INPUT A C OUTPUT 4 96V Series battery wiring BATTERY IN ON OFF BATTERY CHARGER INPUT PROTECT Rs232 A C INPUT A C OUTPUT BATTERY 12V 100AH BATTERY 12V 100AH BATTERY 12V 100AH BAT...

Страница 7: ...T A C OUTPUT ON OFF AC INPUT 220VDC BATTERY BATTERY IN ON OFF BATTERY Rs232 A C INPUT A C OUTPUT ON OFF AC INPUT 192VDC 1 12V Series wiring diagram Soalr module wiring diagram L N L N Rs232 LCD 2 24V...

Страница 8: ...olar panel 2PCS 4 48V Series wiring diagram 36V solar panel 2PCS LCD BATTERY IN ON OFF BATTERY CHARGER INPUT PROTECT Rs232 A C INPUT A C OUTPUT 5 96V Series wiring diagram 36V solar panel 2PCS LCD 5 1...

Страница 9: ...hould be more than 12 hours 6 In high temperature area the battery should be charged and discharged every 2 months and the standard charging time is more than 12 hours Note 1 Before changing battery m...

Отзывы: