ON Semiconductor NB7V33MMNG Скачать руководство пользователя страница 6

NB7V33MMNGEVB

http://onsemi.com

6

NB7V33MMNGEVB TEST

Figure 7. Basic Lab Setup (Typical)

Power Supply

V

CC

V

EE

/DUTGND

DUT

Differential

Signal

Generator

Trigger

Out

Out

1. Connect appropriate power supplies to V

CC

, V

EE

/DUTGND, SMAGND, and ExPad (see Table 2).

2. Connect a signal generator to the input SMA connectors. Setup input signal according to the device data sheet.
3. Connect a test measurement device to the device’s output SMA connectors.

NOTE: The test measurement device must contain 50 

W

 termination.

V

EE

/

DUTGND

Power Supply

GND (0 V)

V

CC

Trigger

Test Measuring

Equipment

Channel 1

Channel 2

DUTGND/
V

EE

ExPad

SMAGND

Table 2. POWER SUPPLY LEVELS

Outputs

Power Supply

V

CC

V

EE

/DUTGND

SMAGND

ExPad

 (typ)

CML

2.5 V

0 V

2.5 V

0 V

V

EE

/DUTGND

CML

1.8 V

0 V

1.8 V

0 V

V

EE

/DUTGND

Table 3. NB7xxxM, CML OUTPUTS “SPLIT” POWER
SUPPLY CONFIGURATION

Device Pin Power
Supply Convertor

“Spilt” Power Supply

V

CC

V

CC

 = 0.0 V

SMAGND

V

TT

 =  0 V

DUTGND

DUTGND = 

2.5 V or 

1.8 V

Figure 8. “Split” or Dual Power Supply Connections

+2.5 V

Dual Power Supplies

V

CC

DUTGND

SMAGND

+0.0 V

+2.5 V

+

+

Offset / “Split” Power Supply Configuration

Содержание NB7V33MMNG

Страница 1: ...It should be used in conjunction with an appropriate ON Semiconductor device datasheet located at www onsemi com The datasheet contains the technical device specifications Board Layout The QFN16 Eval...

Страница 2: ...1 Pin 2 Pin 3 Pin 4 Pin 13 Pin 14 Pin 15 Pin 16 Pin 8 Pin 7 Pin 6 Pin 5 DUT_GND SMA_GND VCC VEE DUTGND SMA_GND Figure 4 Evaluation Board Layout 4 Layer LAYER 1 TOP SIDE 1 OZ ROGERS 4003 0 008 in LAYE...

Страница 3: ...ended to be tied to VEE DUTGND the negative supply of the device The positive power supply connector is labeled VCC Depending on the device the negative power supply nomenclature is labeled either GND...

Страница 4: ...several user dependent LVDS output measurement techniques For LVDS lab setup and test a single supply is typically used ie VCC 3 3 V and DUTGND 0 V Installing the SMA Connectors Each configuration in...

Страница 5: ...No Wire No No No No No GND GND GND VCC No No VCC VCC VCC No VCC NOTE DUTGND VEE Exposed Pad and must be tied to DUTGND VEE CONFIGURATIONS SMAGND SMAGND VCC DUTGND VEE ExPad Figure 6 Power Supply Confi...

Страница 6: ...he test measurement device must contain 50 W termination VEE DUTGND Power Supply GND 0 V VCC Trigger Test Measuring Equipment Channel 1 Channel 2 DUTGND VEE ExPad SMAGND Table 2 POWER SUPPLY LEVELS Ou...

Страница 7: ...4 http www keyelco com Chip Capacitor AVC Corporation 0603 0 01 mF 10 06035C103KAT2A na http www avxcorp com 0603 0 1 mF 10 0603C104KAT2A 2 Chip Resistor Panasonic 0402 50 W 1 Precision Thick Film Ch...

Страница 8: ...NB7V33MMNGEVB http onsemi com 8 Figure 9 Gerber Files Top Layer Second Layer SMA_GND Plane...

Страница 9: ...NB7V33MMNGEVB http onsemi com 9 Figure 10 Gerber Files Third Layer DUT_GND Trace Bottom Layer...

Страница 10: ...ther applications intended to support or sustain life or for any other application in which the failure of the SCILLC product could create a situation where personal injury or death may occur Should B...

Отзывы: