NB4N527SMNEVB
http://onsemi.com
4
Figure 4. Lab Setup for NB4N527S
DO
DO
QO
QO
Q1
Q1
Connect output of
the generator to the
input pins labeled
J2, J3, J14, J15
(D0/D0B, D1/D1B)
Note: Internal
termination pins are
connected to the
SMA GND on the PCB.
D1
D1
Connect outputs of
the device labeled
J9, J10, J11 and J12
(Q0/Q0B, Q1/Q1B)
directly to the scope
head.
Power Supply
VCC
GND
VEE
D
U
T
Differential
Signal
Generator
Test
Measuring
Equipment
Channel 1
Channel 2
Trigger
Trigger
Out
Out
Figure 5. Simplified Equipment Lab Setup Block Diagram
1. Connect appropriate power supplies to V
CC
, V
EE
,
SMA_GND, and SMA_DUT.
2. Connect a signal generator to the input SMA
connectors. Setup input signal according to the
device data sheet.
3. Connect a test measurement device on the device
output SMA connectors.
NOTE: The test measurement device must contain 50
W
termination.