OMS LINEA PATAVIUM S.T.01/3X ED.0 REV.8 09/2017
49
SCHEDULED MAINTENANCE
SCHEDULED MAINTENANCE
Activity
Frequency
By whom?
Note/references
Condensation drain
Weekly
Trained
operator
Instrument lubrication
According to the
instrument
manufacturer’s
instructions
Trained
operator
Aspiration system check and cleaning
Monthly
Authorised
technician
Recommended
Aspiration anti-foam agent tablet
change
Every 2 – 3 days
(when necessary)
Trained
operator
Place in drain filter
Aspiration cannula tab lubrication
15 days
Trained
operator
Silicone spray
Aspiration tube replacement
Annually
Authorised
technician
Main water supply pipe control
Semi annual
Authorised
technician
Main water supply pipe replacing
Annually
Authorised
technician
Disinfect separate distilled water
container for instrument supply
Monthly
Trained
operator
Replace the main unit water filter
Annually
Authorised
technician
Check the instrument water filter
Every 2 years
Authorised
technician
Replace amalgam tank
When indicated by
separator
Trained
operator
According to the instrument
manufacturer’s instructions
Replace disinfection system disinfectant
cartridge
When indicated by
the disinfection
system
Trained
operator
According to the instrument
manufacturer’s instructions
General functional checks
Yearly or after 8000
operating hours
Authorised
technician
Periodic safety/performance checks –
IEC 62353
Two years
Authorised
technician
Mandatory by law
Содержание LINEA PATAVIUM
Страница 1: ...Instruction handbook Dental Unit LINEA PATAVIUM...
Страница 5: ...OMS LINEA PATAVIUM S T 01 3X ED 0 REV 8 09 2017 5 Version with floor spittoon unit...
Страница 51: ...OMS LINEA PATAVIUM S T 01 3X ED 0 REV 8 09 2017 51 Note Check for condensate on a weekly basis...
Страница 70: ......