
5
Application Precautions
xiv
•
Check the user program for proper execution before actually executing it. Not
checking the program may result in unexpected operation.
•
Do not pull on cables or bend them past their natural bending radius. Doing so
may damage the cables and interfere with proper operation.
•
Do not place any objects on the cables.
•
The PC will not start operation even after the power supply is turned ON until
the CS1 Bus Interface Board completes initialization. The time required for ini-
tialization depends on the computer in which the Board is installed, You must
design the system to allow for this delay.
•
Also, if the power supply to the Open Network Controller is interrupted during
operation, the PC will detect an I/O bus error. You must design the system to
allow for this possibility.