background image

J-64

Solid State Relays with Failure Detection Function 

G3PC

Installation

External Specifications

Terminal Arrangement

Indicators

Note:

The same indicator is used as both the power supply indicator 
and the alarm indicator.

Appearance

Connection Example

Note: 1.

If the detection power supply terminal (terminal 3) is not connected, failure detection is not performed and so be sure to connect this 
terminal.

2.

If the load is connected to terminal 1/L1, failure detection may not operate correctly and so connect the load to terminal 2/T1.

3.

With inductive loads (relay coil, etc.), connect back-current prevention diodes to both sides of the load.

Terminal name

Terminal number

Screw size

Main circuit terminals 
(output)

1/L1, 2/T1

M4

Detection power sup-
ply terminal (input)

3

Operating circuit ter-
minals (input)

A1, A2

M3.5

Alarm output termi-
nals (output)

X1, X2

Name

Symbol

Color

Meaning

Status indicators

RDY

Green

SSR normal

ALM

Red

SSR failure detection 
and circuit 
disconnection 
detection

Input indicator

INPUT

Yellow

Operating

3

1/L1

A1(IN

+

)

A2(IN

)

X1(ALM

+

)

X2(ALM

)

2/T1

RDY/ALM

INPUT

1

3

2

X1

X2

(See note 1.)

(See note 2.)

Voltage output for Temperature 
Controller, sequencer

12 to 24

VDC

30 VDC 

min.

Input for Temperature 
Controller, sequencer

Heater

L1

AC

IN

ALM

T1

A1

A2

Display Labels

Содержание G3PC

Страница 1: ...a heat sink In addition to screw mounting DIN track mounting is also possible Certified by EC UL and CSA Model Number Structure Model Number Legend 1 Basic Model Name G3PC SSR with Failure Detection F...

Страница 2: ...N open collector Operate time 1 2 of load power source cycle 1 ms max Release time 1 2 of load power source cycle 1 ms max Main circuit Output ON voltage drop 1 6 V rms max OFF leakage current 10 mA m...

Страница 3: ...00 150 200 250 The figure will be less than 1 2 the rated value for repetitive input One Cycle Surge Current Non repetitive Load Current vs Ambient Temperature Input Voltage vs Input Current Input Vol...

Страница 4: ...on Note 1 With 3 phase connection so that the power supply voltage is applied between the G3PC s terminals 1 L1 and 3 connect the desired phase to terminal 3 2 Above mentioned products are 200V only T...

Страница 5: ...he above diagram is for when the terminal cover is closed 4 6x5 6 elliptic hole 130 max 1 100 max 22 5 max Terminal cover Tow 4 6 dia Three 4 5 dia or M4 4 5 15 25 10 25 25 25 10 1 000 500 7 3 0 15 35...

Страница 6: ...3 With inductive loads relay coil etc connect back current prevention diodes to both sides of the load Terminal name Terminal number Screw size Main circuit terminals output 1 L1 2 T1 M4 Detection pow...

Страница 7: ...te Use the G3PC at a load current of 80 of the rated load current when it is mounted side by side Wiring When using crimp terminals observe the terminal clearances shown below Make sure that all lead...

Страница 8: ...3PC In the interest of product improvement specifications are subject to change without notice ALL DIMENSIONS SHOWN ARE IN MILLIMETERS To convert millimeters into inches multiply by 0 03937 To convert...

Отзывы: