90
eCobra 600 and 800 Robots with EtherCAT
24402-000 Rev B
Figure 5-6. Solenoid Connector Location and Spare Air Line (blue, coiled)
Solenoid Valve Kit Installation Procedure
Use the following procedure to install the Solenoid Valve Kit.
1. Turn OFF all power to the robot.
2. Remove the screws from each side of the outer link cover (two screws on an eCobra 600,
three screws on an 800). Remove two screws on top and remove the cover. Retain the
screws for reassembly.
For IP65 and Cleanroom versions, refer to Outer Link Cover Removal Procedure on
page 159 for instructions on removing the link cover. Retain the screws for reassembly.
3. Connect the Internal Solenoid Valve Cable assembly to the Solenoid Manifold assembly,
by plugging the SOL 1 connector into Valve 1 and SOL 2 into Valve 2.
Figure 5-7. Solenoid Mounting Bracket with Connector and Spare Air Line