5-5
5 Installation and Wiring
CP1E CPU Unit Hardware User’s Manual(W479)
5-2 I
n
stal
la
ti
o
n
5
5-2-1
I
n
st
all
a
tion Lo
cat
ion
z
Improving Noise Resistance
Leave space between the CP1E and control panel or other devices to allow adequate dissipation of
heat generated by the power supply.
•
Do not mount the PLC in a control panel containing high-voltage equipment.
•
Install the PLC at least 200 mm (6.5 feet) from power lines.
•
Ground the mounting plate between the PLC and the mounting surface.
z
Temperature Control
The ambient operating temperature around the CP1E must be between 0 and 55ºC. Observe the fol-
lowing precautions.
•
Provide enough space for good air flow.
•
Do not install the PLC above equipment that generates a large amount of heat such as heaters,
transformers, or high-capacity resistors.
•
If the ambient temperature exceeds 55ºC, install a cooling fan or air conditioner.
SYSMAC CP1E
200 mm min.
200 mm min.
Power Line
SYSMAC
CP1E
Fan
Control panel
Louver
Содержание CP1E-E10DT-A
Страница 3: ......
Страница 31: ...26 CP1E CPU Unit Hardware User s Manual W479...
Страница 273: ...Index 4 CP1E CPU Unit Hardware User s Manual W479...
Страница 275: ...Revision 2 CP1E CPU Unit Hardware User s Manual W479...
Страница 276: ......