9
BP100XSG/BP150XSG Instruction Manual
1
2
Tighten the 4 screws.
Pb
Battery replacement is now complete.
7. Attach the front panel.
Push the front panel toward the main body.
1
Use a screwdriver to securely tighten (clockwise) the 4 screws at the top of the front
panel.
2
Write the date you started using the battery on the included battery replacement
date label, and attach it to the front panel.
Also, by using the included UPS monitoring software, possible to keep a record
of usage start date by the software.
<After replacing the battery when operation was stopped...>
Connect the AC input plug to a wall outlet (commercial power) and turn ON the
power switch of the UPS. When operation starts, the self-diagnostic test is automati-
cally performed. Normal operation resumes after the 10-second test.
<After replacing the battery during operation...>
If the battery replacement indicator is displayed and the beeper sounds before
replacement, press the beep stop/test switch once to stop the beeper, and hold it
for 5 sec. to perform a self-diagnostic test. The beeper stops and normal operation
resumes after the 10-second test is complete.
u
NOTE
u
Battery recycling
l
The unit uses lead acid batteries, which are a valuable recyclable resource.
Please recycle.