![OMP Hobby M2 Evo Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/omp-hobby/m2-evo/m2-evo_instruction-manual_740772013.webp)
step 8
步骤八
28.2mmx3
CH3
CH1
CH2
28.2mm
10
!
CAUTION
Linkage rod
Approx.28.2mmx3
CH2 Linkage rod
CH1 Linkage rod
CH3 Linkage rod
Flight Control
Double-sided tape
Note:Fist,the double-sided damping rubber
should be fully fitted with the receiver board,
and then install the flight control.The flight
control must be completely parallel to the
fuselage to achieve the best flight performance.
Linkage rod
13
EN
WWW.OMPHOBBY.COM
Содержание M2 Evo
Страница 15: ...step 10 Batteries 15 EN WWW OMPHOBBY COM...
Страница 16: ...step 11 Canopy 16 EN WWW OMPHOBBY COM...
Страница 24: ...24 EN WWW OMPHOBBY COM Memo...
Страница 25: ...2022 www omphobby com Zhuhai edge smart dirve technology Co Ltd...