
14
EN
WWW.OMPHOBBY.COM
step 9
步骤九
连杆约
28.2mmx3
Linkage rod
Approx.28.2mmx3
约
28.2mm
约
10mm
CH3
连杆
CH3 Linkage rod
CH2
连杆
CH2 Linkage rod
CH1
连杆
CH1Linkage rod
飞控
双面胶
Flight Control
Double-sided tape
注意:先将双面减震胶与接收机板完全贴合好,再
安装飞控。飞控必须与机身完全平行,以达到最佳
的飞行效果。
!
注意
CAUTION
Note:Fist,the double-sided damping rubber should be fully
fitted with the receiver board,and then install the flight
control.The flight control must be completely parallel to the
fuselage to achieve the best flight performance.
Содержание M2 2020
Страница 17: ...17 EN WWW OMPHOBBY COM step 12 Canopy protector Canopy...
Страница 25: ...25 EN WWW OMPHOBBY COM Memo...
Страница 26: ...2020 www omphobby com Zhuhai edge smart dirve technology Co Ltd...