4 Installation 

4.1 Mounting Location 

 

DANGER!

 

Danger to life due to fire or explosion! 

● Do not mount the inverter on flammable construction 
materials. 
●  Do  not  install  the  inverter  in  areas  where  highly 

flammable materials are stored. 

●  Do  not  install  the  inverter  in  areas  with  a  risk  of 
explosion. 

 

In  order  to  ensure  that  the  inverter  operates  properly,  the  installation  environment  and 

requirements are as follows: 

  The  inverter  is  intended  for  outdoor  use  with  IP  65  rating.  The  installation  location 

should be cool and in good ventilation. Do not expose the inverter in the direct sunlight, 

otherwise, it may result in excessive temperature rise inside the inverter, downgrading 

operation of protection circuit and even shutdown due to over-temperature fault. 

  Rain and snow do impact on the service life of the inverter, do not install the inverter 

in the rain and snow or do some appropriate shelter.   

  The inverter adopts natural cooling, the ventilation and cooling are very important. Do 

not install the inverter in a closed enclosure, otherwise the inverter should be too hot 

to operate or even damaged.   

  The inverter should be installed in the reinforced concrete wall or metal wall that can 

bear the weight of the inverter. The inverter must be installed vertically. Ensure that 

the installation place does not shaking.   

  The inverter operation will generate some noise (< 40 dB), it should be installed away 

from  the  residential  areas.  Ensure  that  the  installation  location  is  convenient  for 

viewing LED lights and LCD display screen. Sufficient clearances around the inverter 

must be reserved for ventilation, cooling, installation, maintenance and safe access. 

  Do not install the inverter outdoors in salt areas because it will be corroded there and 

may cause fire. A salt area refers to the region within 500 meters from the coast or 

prone  to  sea  breeze.  The  regions  prone  to  sea  breeze  vary  depending  on  weather 

conditions (such as typhoons and monsoons) or terrains (such as dams and hills). 

 

 

CAUTION 

Ambient temperature range shall be -25°C to +60°C. It will affect the 

inverter output power when the temperature exceeds the limit.   

Environmental relative humidity must be in the range of 0% ~ 100%. 

 

 

 

4.2 Mounting the Inverter 

4.2.1 Clearance

 

Содержание Omniksol-10KW-TL3-NS

Страница 1: ...User Manual Grid Connected Inverter Omniksol 5KW 6KW TH TL3 NS 8KW 10KW 13KW 16KW TL3 NS...

Страница 2: ...your purchase or use Unless otherwise specified in the contract no presentation is made or warranty either express or implied as to the contents of this document As standards specifications and desig...

Страница 3: ...ion 10 4 1 Mounting Location 10 4 2 Mounting the Inverter 10 5 Electrical Connection 13 5 1 Safety Precautions 13 5 2 Cable Requirements 13 5 3 DC Connection 14 5 4 AC Connection 15 5 5 Second Protect...

Страница 4: ...inor or moderate injury NOTICE NOTICE is used to address practices not related to physical injury but to property damage NOTE NOTE is additional information in the manual which is emphasis and supplem...

Страница 5: ...tions and safety precautions in this document Operation in extreme environments which are not specified in this document Operation beyond specified ranges Unauthorized modifications to the product or...

Страница 6: ...sensitive components may result in damage to the components Avoid unnecessary contacts with circuit boards Comply with electrostatic protection standards wear an antistatic wrist strap When installin...

Страница 7: ...ted into DC via PV modules and then the DC is converted into sinusoidal AC which has the same frequency and phase as the utility grid and fed into the utility grid via inverters Components Description...

Страница 8: ...and the groups of relays have self test function that can ensure reliable disconnecting of the connection between the inverter circuit and the utility grid in the event of a failure It realizes the re...

Страница 9: ...on Interface of demand response modes for Australia grid dispatching AC Output Terminals To feed the inverter output energy into the grid Ammeter Communication and Digital Input Input interface for el...

Страница 10: ...A 13kVA 16kVA Max Output Current 7 3A 8 7A 11 6A 14 5A 18 9A 23 2A Rated Grid Voltage 230 400V 3W N PE Grid Voltage Range 176 276V 304 480V Rated Grid Frequency 50 60Hz Gird Frequency Range 45 55 55 6...

Страница 11: ...ge may still occur during transport Check that the delivery is complete check the packaging and the inverter for externally visible damage and inspect the package contents upon receipt Notify the carr...

Страница 12: ...erter should be stacked it is recommended that the maximum number of layers can be accumulated no more than 5 layers The inverter must avoid the corrosive chemicals otherwise it may be corroded It nee...

Страница 13: ...n a closed enclosure otherwise the inverter should be too hot to operate or even damaged The inverter should be installed in the reinforced concrete wall or metal wall that can bear the weight of the...

Страница 14: ...splay at eye level and by keeping a distance of 100 cm from the front All cables are routed to the outside through the underside of the enclosure Therefore a minimum clearance of 50 cm must be observe...

Страница 15: ...ll mounting bracket on both sides using the M5 screws provided Tighten the screws and make sure that they are securely in place 5 The Wall mounting bracket reserved a padlock hole to prevent the inver...

Страница 16: ...ided otherwise the IP rating of the inverter may be reduced CAUTION All cables must be connected firmly and reliably properly insulated and avoid to be damaged easily CAUTION The inverter can only be...

Страница 17: ...rcuit current for each PV string is no more than 12 A NOTE All models of inverters are featured with two MPPT inputs and two groups of input terminals and two groups of PV strings can be connected to...

Страница 18: ...damage to the inverter 4 Disconnect the circuit breaker on the DC side and connect the PV input cable to the inverter separately 5 4 AC Connection WARNING Ensure that electrical connections are in com...

Страница 19: ...he PE wire is properly grounded As shown in the figure below 3 Insert the shell into the AC terminal hear a sound of click then tighten the waterproof connector cap 4 Push the locker onto the socket h...

Страница 20: ...nt on the enclosure There is a protective grounding hole at the bottom of the inverter The user must make the inverter grounded through the grounding hole and tighten it with M4 8 screws As shown in t...

Страница 21: ...front end of the connection point between the inverter all loads and the grid that is close to the public power grid The direction of the current transformer CT is from the user side to the public po...

Страница 22: ...ption 2 Live A No special requirements 5 Live B No special requirements 8 Live C No special requirements 10 Neutral No special requirements 1 CT Live A White wire 3 CT Live A Black wire 4 CT Live B Wh...

Страница 23: ...serted into the COM2 connector the RJ45 plug for DRM communication is inserted into the COM3 connector only for Australian configuration The enlarged image of the meter communication interface and DRM...

Страница 24: ...cted to the COM2 and COM3 interfaces Please install the waterproof terminal to ensure the waterproof performance of the inverter when external network cables are connected to the COM2 and COM3 interfa...

Страница 25: ...ts and flashes and the inverter starts detecting 5 When the illumination conditions meet the working requirements of the inverter the inverter will automatically start running and deliver power to the...

Страница 26: ...ame time it indicates that a program upgrade is in progress Do not perform any operation before the program upgrade is completed 7 4 Auto test function For Italy There is only the Italian grid connect...

Страница 27: ...24 So far the auto test is completed...

Страница 28: ...on App The user can view the running status of the inverter configure the operational parameters and upgrade the software via the professional App Professional App is recommended for professionals ope...

Страница 29: ...og in in the App home page and enter your email and password 8 1 3 Create Plant 1 Method 1 Click on Add in the App home page and click the Plant icon from the pop up menu then scan the serial number o...

Страница 30: ...n Enter the interface of plant information after successfully scanning the serial number or clicking on No Device Confirm your plant location GPS function will automatically locate the plant site If y...

Страница 31: ...28 electricity prices and subsidies 3 Enter the plant name It is suggested to create a plant name like location name capacity then click on Done 4 Then the plant you added is shown on the homepage...

Страница 32: ...tion to enable users to obtain the running status information of the inverter in time 8 2 1 Software Installation Search Solarman in Apple Store to download the App for iPhones Search Solarman in Goog...

Страница 33: ...2 Edit Plant Information Confirm your plant location GPS function will automatically locate the plant site If you want to modify the location click the map icon and then manually enter the plant addre...

Страница 34: ...31 3 Enter the plant name It is suggested to create a plant name like location name capacity then click on Done 4 Then the plant you added is listed on the homepage...

Страница 35: ...d AC terminals Contact the local operation and maintenance personnel for any help PV Reversely Connected Positive and negative polarity of DC input PV 1 or PV 2 are reversely connected Contact the loc...

Отзывы: