15
BOWL pACKING ASSEMBLY
As shown to the left in the dotted
circle, let the protrusion part on the
bowl packing face upward and hold
it, like pinching, with your thumb and
index finger.
If the bowl packing at the bottom of the
bowl is not fully inserted and is bent, set
it into place with the rotating attractor of
the cleaning brush.
• I nsert the bottom of the bowl packing
into the bowl hole and fully press it down.
• Do not insert whole part of bowl packing.
• The upper part of the bowl packing
must be shown.
2
1
3
Bowl
Packing
Содержание VRT350
Страница 4: ...SAFETY FIRST...
Страница 6: ...KNOW YOUR OMEGA...
Страница 8: ...QUICK START ASSEMBLY...
Страница 10: ...HOW TO ASSEMBLE...
Страница 12: ...5 operating instructions...
Страница 14: ...5 Spinning Brush Assembly Disassembly and Washing...
Страница 16: ...5 BOWL PACKING ASSEMBLY...
Страница 18: ...5 Sterilization Easy Cleaning...
Страница 20: ...5 Precautions for Safe Use...
Страница 24: ...5 if the auger stops working...
Страница 26: ...5 Hints Tips...
Страница 28: ...5 TROUBLESHOOTING...
Страница 30: ...5 PRODUCT SPECIFICATIONS...
Страница 32: ...RECIPES...