background image

Содержание RG-2500 Series

Страница 1: ...ManMal Operator I 03 a Tipping Bucket Rain Gauge 8 E RG 2500 Series...

Страница 2: ...and 6TU England LE9 y 25 Swannington Road Broughton Astley Leicestershire l BOO USA WHENSM TELEX 996404 EASYLINK 62968934 CABLE OMEGA Servicing Europe United Kingdom Sales and Distribution Center l B...

Страница 3: ...Y i...

Страница 4: ...ment please call the OMEGA Customer Service Department When you receive the shipment inspect the container and equipment for signs of damage Note any evidence of rough handling in transit Immediately...

Страница 5: ...Y...

Страница 6: ...3 Field Calibration 3 4 2 Calibration Procedure 3 4 1 Factory Calibration 3 Chapter 4 Calibration 2 Chapter 3 Operation 2 2 2 Installation 2 2 1 Site Requirements 1 1 2 Specifications 1 Chapter 2 Ins...

Страница 7: ...has a twelve inch diameter orifice Both gauges have been designed with high grade materials and have been built to provide years of trouble free operation Each of the two gauges consists of a main col...

Страница 8: ...ch foot has a mounting hole with a diameter of gaugewell above the average local snow level The exposure would be best if the tower were Chapter 2 Installation 2 1 Site Requirements The location of th...

Страница 9: ...t change during shipping unless the gauge becomes damaged Checking of the gauge calibration may be made after the gauge has been installed to ensure the accuracy of the data 4 2 Calibration Procedure...

Страница 10: ...med if necessary If the calibration bottle is not available use any calibrated measuring device and slowly pour the water into the gauge Keep track of the bucket tips either manually or through the us...

Страница 11: ...this situation the single tip amount of water calibration method may be better for correcting the one side of the bucket to match the other side more closely Do not dry the buckets during the adjustme...

Страница 12: ...lts use conduit to protect the cables Chapter 6 Troubleshooting Failure of the rain gauge to operate usually is the result of loose wiring Inspect the cable connections to ensure the connections are s...

Страница 13: ...UGES 175 VD C MAXIMU M TYPICAL CLOSURE TIME 0 1 SECON D NOTES 0 25A 0 BLK MAGNET N O 27 VD C MAXIMUM 3 WATT S IL7 w DIODE BLK SWITCH 2 PI N TB RED __ _ __ OPEN MODEL 330 022 0 TYP IC A L DIODE r Z PI...

Страница 14: ...ALIVE ON THE 4 PI N TERMINAL BLOCK WHENEVER THE POWE R CORD IS PLUGGED INTO A POWER OUTLET TERMINALS ARE EXPOSED INSIDE 115 VA C FIRE ROD HEATER 400 W ib 25 FT POWER CORD 18 AWG SVT 4 PI N TERMINAL B...

Страница 15: ...0 7t BY L oo MOUNTING FEET PAT WTH LEVELER I 8 0...

Страница 16: ...OAIE By u uoo MOUNTING FEET PAT LEVELER 0 WlTH t MOUNTING FOOT 2 0 2C 5...

Страница 17: ...a I a...

Страница 18: ...ELER 12 INCH RAIN GAGE BASE ASSEMBL Y I MTH FOOJI JE ADJUSTMENT SCREW TIPPING BUCKET SIGNAL OUTPUT CONTACT CLOSURE COLLECTION TUBE f 2 PIN SIGNAL TERMINAL BLOCK CALIBRATION POST INNER FUNNEL 7 RAIN GA...

Страница 19: ...UOD 1 4 PIN TERMINAL BLOCK IS POSITIONED BEHIND HEATER 2 OUTER COVER NOT SHOWN 1 nn E NOTES W lT HLE M LER RAIN GAGE BASE ASSEMBLY VIEW OF MAGNET SIDE d_ SIDE VIEW WIRING OMITTED RAIN GAGE FUNNE L TA...

Страница 20: ...EIGHT ADJUSTING NUTS FOR ALL THREE OF THE RAIN GAGE MOUNTING FEET UNTIL THE RAIN GAGE IS LEVEL ACCORDING TO THE SPIRI BUBBLE LEVEL LOCATED ON THE RAIN GAGE B FOR WOODEN PLATFORMS THERE ARE EXTRA NUTS...

Страница 21: ...ICAL OF THREE EAC FOR INSTALLATIONS USING A 36 ALTER STYLE WIND SCREEN THIS HEIGHT MUST BE ADJUSTED SO THAT THE TOP EDGE OF THE RAIN GAGE IS WITHIN 1 INCH OF THE TOP EDGE OF THE WIND SCREEN LEAVES SET...

Страница 22: ...I I I I I...

Страница 23: ...WING NOT TO SCALE W ARN I NG LABEL CLAMP 2 x 11 THERMOSTAT C 1 FIREROD HEATE R HEAT S I NK TUBE PLUG SOCKET i 42 POUTION i 25 x 11 S ILVER TAPE THERMOSTAT BRACKET SHOWN IN INVERTED FOIL 00 INSULATING...

Страница 24: ...E 1 S 8 DIA NYLON NATURAL 1 SPADE LUG 875 DIA BLACK 3 PLUG HOLE 3 8DIA 1 PLUG VENT 3 8 DIA 1 COVER MAGNET ARM 1 TUBE COLLECTION 2 POST CALIBRATION SCREW 2 FUNNEL 8 ANODIZED 1 COVER 8 RAIN GAUGE 1 BASE...

Страница 25: ...Y 16...

Страница 26: ...EBY DISCLAIMED LIMITATION OF LIABILITY The remedies of purchaser set forth herein are exclusive and the total liability of OMEGA with respect to this order whether based on contract war ranty negligen...

Страница 27: ...uipment DATA ACQUISITION pH m Industrial Pumps Controllers Calibrators Simulators BenchtopjLaboratory Meters pH Electrodes Testers Accessories Batch Controllers H CONDUCTIVITY Totalizers D 5 Turbine P...

Отзывы: