Omec PL.06.00 Скачать руководство пользователя страница 4

 
 

 

It  is    possible  to  program  only  the  boiling  phase  by  setting  0°C  as  preheating  temperature 
(phase no. 1). 
For boiling it is necessary to set FULL as boiling temperature (phase 2). 
 
If the boiling temperature is set on  FULL, the rising speed is automatically set on FULL. 
The rising speed values do not correspond to °C/min but they refer to numbers of a scale where 
the max. value is FULL (heating element always working). 
 
The  set  value  is  the  time  measured  in  seconds  where  the  heating  element  works  for  a  20  second 
period time and these time periods repeat until the temperature set is reached. 
 
I.E.  if  12  it  the  value  is,  the  heating  element  works  cycling  for  12  seconds  and  it  stays  OFF 
for 8 seconds until the temperature set is reached. 
The  rising  speed  parameter  has  also  to  be  set  considering  the  water  contained  in  the 
polymerization  tank  (the  bigger  is  the  quantity  of  water  the  highest  will  has  to  be  the  value 
set9: 
 
 

SIDE  III    INSTALLATION AND USE INSTRUCTIONS

 

 

INTRODUCTION

 

 
Before starting-up the machine, follow precisely the following instructions. 
 
Make  sure  that  your  electric  equipment  has  a  good  earth  and  that  it  is  in  conformity  with  the 
2006/95/EC - Low Voltage. 

 

3.1.1  INSTALLATION

 

 

 

-

 

Verify the apparatus has not stood any evident damage during transportation. 

-

 

Place  the  apparatus  on  a  stable  horizontal  non  flammable  surface  away  from  any  water 

sprayings  and  from  flammable  materials.  The  polymerizing  unit  has  to  be  placed  on  a 
sufficiently wide surface to allow proper ventilation. 

-

 

Fit the muffles in the tank and put water in the tank with a container till the muffles are 

covered up. 

-

 

The machine has not to be used without water. The heating element has to be always covered by 

the water (the minimal water level is up to the holed grille). Do not place the polymerizing 
unit under a spout of water for any reason. 

-

 

Before  installation  make  sure  the  supply  mains  are  in  conformity  with  tag  data  (230  Vac  – 

50/60  Hz)  and  that  the  power  line  is  protected  by  a  differential  thermo  magnet  switch.  Also 
check  electrical  inputs  and  powers  installed.  If  you  are  not  sure  of  what  kind  of  power  you 
have,  please  contact  the  Electric  Power  Company.  In  particular,  verify  if  the  grounding 
system is efficient. 

-

 

Make sure the general switch is on OFF position (0), then connect the electric cable plug to 

an electrical inlet.

 

 

3.2.1  PICTURE NO.1 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 

- Page 2/9 - 

 

Содержание PL.06.00

Страница 1: ...K Machine POLYMERIZING UNIT Type PL 06 00 PL 12 00 O M E C Snc di R CARNEVALE C Via dell Artigianato 3 5 7 I 20835 Muggi MB ITALY Tel 39 039 793740 Fax 39 039 2780689 E Mail export omec snc com omecsn...

Страница 2: ...allation 2 9 3 2 1 Picture No 1 2 9 3 2 2 Picture No 2 3 9 3 3 1 Programming of cycle 4 9 3 4 1 Start up programming 6 9 3 5 1 Working cycle 7 9 3 6 1 Inspections 7 9 3 7 1 Power failures 8 9 3 8 1 Wa...

Страница 3: ...and not damaged due to bad carrying b Follow carefully the instructions for installing the machine c The OMEC POLYMERIZING UNIT TYPE PL 06 00 PL 12 00 must be used only by a skilled worker and therefo...

Страница 4: ...ic equipment has a good earth and that it is in conformity with the 2006 95 EC Low Voltage 3 1 1 INSTALLATION Verify the apparatus has not stood any evident damage during transportation Place the appa...

Страница 5: ...lding time 7 Value increasing key 8 Value decreasing key 3 2 1 PICTURE NO 2 3 3 1 PROGRAMMING OF CYCLE To program a cycle follow correctly and as in the indicated order the instructions below Turn on...

Страница 6: ...never to set a value lower then 13 otherwise the heating will be too slow while setting this value always consider the quantity of water inside the tank the more water there is in the tank the slower...

Страница 7: ...n sequence If the operator has set FULL as temperature value boiling temperature then the words FULL max speed will appear on display In this case the speed increase is automatically set at FULL max v...

Страница 8: ...perator immediate switching on deferred switching on During programming of start up the red leg of key flashes intermittently Immediate switching on Polymerizing unit on OFF press the START STOP key F...

Страница 9: ...erature set on the display is reached the time holding value set for the running phase followed by the real temperature of the water inside the tank will be shown on the display just for a few seconds...

Страница 10: ...in phases no 1 and no 2 When power returns two cases may present If the power has failed for a short time and the water temperature has not decreased the polymerizing unit will run again all the progr...

Страница 11: ...d do not put cable in places where it can be stepped over In case of extended inactivity disconnect the electrical cable Before any transportation always empty the tank and use the original packaging...

Отзывы: