Omcan DAL-06 Скачать руководство пользователя страница 6

6

Important

The fi nal result of the processing may vary depending on the quality of garlic that is 

being processed.

Operation

PRE-OPERATION

Check the voltage of the machine. The voltage of the unit must correspond with the power supply. Make sure the 
unit is properly grounded. Make sure the machine is in a stable position. The water inlet pipe and drainage pipe 
must be installed properly as indicated below (Pic. 3).

Picture 3

The water ouypoor thet enters the equipment must not pass beyond the center of the disc, as indicater in the 
drawning-01
The water outfl ow not exceed 2,5 liters per minute.

IMPORTANT: BE SURE THE PLATE IS FIRMLY FITTED ONTO THE CENTRAL SHAFT PIN.

First, check if the lid (Pic. 1, #4) is properly fi tted on the top of the unit. To start the machine, toggle the switch 
(Pic. 1, #2) to the ON position. Let the water fl ow into the chamber and load it with food product. Water will then 
fl ow  out  through the  waste  outlet.  Each  load  shall  not  exceed  4  kg. The  peeling  time is 8  minutes,  however 
depending on the hardness of the food product, size and irregularity, the time may vary. Check if products are 
peeled looking through the opening of the top lid. Remove the peeled product from inside the chamber manually 
after closing the faucet, turning the machine off  and disconnecting it from the power supply.

IMPORTANT: UNDER NO CIRCUMSTANCES SHOULD YOU PUT YOUR HANDS IN THE MACHINE DURING 
OPERATION.  BE  SURE  THAT  THE  UNIT  HAS  COMPLETELY  STOPPED  BEFORE  REMOVING  THE 
PROCESSED GARLIC.

11

Содержание DAL-06

Страница 1: ...s in North America Europe and Asia our global footprint continues to expand as we hold to the principle that clients bene t from the accessibility and familiarity of our sales team In 2013 as our geog...

Страница 2: ...5 6 7 8 9 10 13 Table of Contents Section General Information Safety and Warranty Technical Speci cations Installation Operation Maintenance Parts Breakdowns Electrical Schematics Warranty Registratio...

Страница 3: ...unit in operation NEVER lift the lid before being sure the plate Pic 1 6 is has completely stopped The plate must be properly tted onto the central shaft pin Pic 2 2 BE CAREFUL when handling the plate...

Страница 4: ...card at the perforation and then send to the address speci ed below You can also register online by visiting OMCAN INC PRODUCT WARRANTY REGISTRATION 3115 Pepper Mill Court Mississauga Ontario Canada...

Страница 5: ...ust be installed on a at non skid work surface During peeling operation the food product must be wet by means of 3 4 inlet pipe Pic 1 1 An alternative is to place the machine below a 3 4 water faucet...

Страница 6: ...ED ONTO THE CENTRAL SHAFT PIN First check if the lid Pic 1 4 is properly tted on the top of the unit To start the machine toggle the switch Pic 1 2 to the ON position Let the water ow into the chamber...

Страница 7: ...FF and disconnect it from power source 2 Wait until the plate is completely still 3 To lift the plate out of the cylinder pull it upwards 4 Wash the machine and the plate with water and neutral soap 5...

Страница 8: ...9 5 ELECTRICAL SWITCH CABLE 05193 4 MB 05504 2 COMPLETE MOTOR SUPPORT DB 06 08252 0 Descrip on Item No NIPLE SET REDUCTION 09240 1 TUBO TERMO ENCOL 1 4x20mm 09534 6 ID LABLE MOTOR RESIST 10204 0 SCREW...

Отзывы: