OLYS STC-LED-V2.0 Series Скачать руководство пользователя страница 2

Work

 

mode

LED1(green

)s tats

 
 

On

nomal

 

voltage

 

slowly

 

flashing

charging

 

OFF

: 

PV

 

 does not supply electricity

digital

 

tube

 

stats

  

 

flashing

: 

data

 

reception

 

success

LED

2

(red

/

green

battery

 

stats

  

 

ON

:           

normal

 

Slowly flashing

full

 

fast flashing

:  

over

 

voltage

 

orange

:        

under

 

voltage

 

Red

            

over

 

discharged

<

一>  

work

 

mode

,(

4 periods work mode

setting

LED lamp

po we r

H1

H2

H3

H4

100%

the

 

day

the

 

night

the

 

day

+

+

-

-

+

-

Infrared receiving head

battery

 

stats

red

/

green

LED

2

charge

 

stats

green

LED

1

P V

+(

r e d

 B a tte r y +

R e d

P V

-(

B l ue

B a tt e r y

b l a ck

l oa d-

g re en

l oa d+ 

r ed

Connecting

            1. Connect sequence: battery --solar array --loads

            2. Wier size: min4.0mm

            3. Grounding the solar system: Be aware that the positive terminals 

               of the SLDcontroller are  connected internally and therefore have

               the same electrical potential. if any grounding is required ,always

               do this on the  positive wires.

             

Display  functiong in normal operation

 Setting swich+LED

  

 setting load work mode

 see“setting”

working parameters can also 

be set with a remote control    

Отзывы: